North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

 
 
 

DA NANG PORT
1. Port's name & contact address:


Port's name: DA NANG PORT
Under: Vietnam National Shipping Lines
Port's location: 16°07'02"N - 108°12'08"E
Pilot boarding position: 16°10'N - 108°11'E
Address: 26 Bach Dang street, Da Nang city
Tels: 84.511.3822513 / 3835675
Fax: 84.511.3822565
E-mail: cangdn@dng.vnn.vn
Website: http://www.danangportvn.com





Mr. Nguyen Thu
2. Management
Director General
Mr. Nguyen Thu
Tel: 84.511.3821114
Deputy Director General, Bussiness
Mr. Nguyen Huu Sia
Tel: 84.511.3822512
Deputy Director General, Operations
Mr. Pham Ngoc The
Tel: 84.511.3835675
Deputy Director General, Engineering
Mr. Nguyen Xuan Dung
Tel: 84.511.3822517
3. Access channel:


Length 6 km. Channel depth: -10-17 m. Tidal regime: semi-diurnal. Average tidal range: 0.9 m.
Max. draft: -12 m. Maximum size of vessel accepted: 45,000 DWT

4. Infrastructure and equipment:

. Berth facilities:

Name/No.

Length

Depth alongside

Vessel/Cargo

Wharf No.1 Tien Sa
Wharf No.2 Tien Sa
Wharf No.3 Tien Sa
Wharf No.4 Tien Sa
Wharf No.5 Tien Sa
Wharf No.1 Song Han
Wharf No.2 Song Han
Wharf No.3 Song Han
Wharf No.4 Song Han
Wharf No.5 Song Han

185 m
185 m
185 m
185 m
225 m
140 m
100m
100 m
92 m
93 m

-11 m
-10 m
-10 m
-11 m
-12 m
-7 m
-7 m
-7 m
-7 m
-7 m

≤45.000DWT
≤40.000DWT
≤40.000DWT
≤40.000DWT
2000 TEUS & Dead weight: 45,000 DWT
Gen. Cargo upt to 5,000 DWT
ditto
ditto
ditto
ditto


. Storage facilities:

Total area  : 299,265 m2, of which:
Warehouse/shed      : 29,204 m2, of which CFS: 2,014 m2.
Open storage : 183,722 m2, of which container yard: 82,400 m2.


. Major equipment:

Type

No.

Capacity

Quayside gantry crane 2
36 MT
Rubber-typed gantry crane 2
36 MT
Shore crane 2
40 MT
Shore cranes 23
10 ~ 80 MT
Reach stacker 2 42 MT
Forklift/toplift trucks 32
1.5 ~ 22 MT
Tractor, dump truck 28
20 ~ 40 MT
Computerized scale bridge 3
80 MT
Tug boat 7
350 HP & 1700 HP
5. Cargo throughput:
2003 2004 2005 2006 2007 2008 2009 2010
Total 2.178.588 MT 2,308, 973 MT 2,256,068 MT 2,371,024 MT 2,736,936 MT 2.742.257 MT 3,132,343 MT 3,303,036 MT
Import 824.305 MT 724,668 MT 778,440 MT 414,791 MT 489,273 MT 525,906 MT 63,365 MT 645,617 MT
Export 554.147 MT 739,850 MT 5,171 MT 892,081 MT 1,241,204 MT 1,230,793 MT 1,352,212 MT 1,388.924 MT
Domestic 800.136 MT 844,455 MT 882,457 MT 1,064,152 MT 1,006,459 MT 985,558 MT 1,716,766 MT 1,268,495 MT
Container 27.163 TEUs 32,416 TEUs 32,343 TEUs 37,404 TEUs 53,372 TEUs 61,881 TEUs 69,720 TEUs 89,199 TEUs
Ship calls 894 1,026 1,290 1,312 1,505 1,542 1,800 1,603
6. Development Plans

 

Dự án (Project)

Tổng kinh phí

(Investment cost)

Kế hoạch thực hiện (Implementation)

Đầu tư xây dựng cảng Sơn Trà (Construction of Son Tra Port)

450 tỷ Đồng (VND 450 billion)

2009-2014, đang triển khai (ongoing)

Đầu tư xây dựng Cảng Tiên Sa giai đoạn 2 (Construction of Tien Sa Port – Phase 2)

500 tỷ Đồng (VND 500 billion)

2013-2015, đang chuẩn bị dự án (project being prepared)

Đầu tư trung tâm dịch vụ logistics 20ha (Construction of 20ha Logistics Services Center)

500 tỷ Đồng

(VND 500 billion)

2012-2015, đang chuẩn bị dự án (project being prepared)

Đầu tư thiết bị xếp dỡ công-ten-nơ) (Purchase of container handling equipment)

25 tỷ Đồng

(VND 25 billion)

2011, đang triển khai  (ongoing)



 

7. Main services:

Cargo handling, tallying, warehousing. Tug assistance to vessels entering into/depart from the port. Transporting and freight forwarding agency. Building and repairing of construction works. Repairing means of transportation. Supply of fuel/oil, fresh water and food provisions to ocean vessels. Garbagge removal. Rust chipping. Shipping agency, and other marine related services.
8. Computer system:

80 PCs, 2 servers Hp proliant 350G3 and 350G4, applied in  port operations and management with Container Managenet System CASTOS, LAN + access to Internet.


 