HAI SON PORT |
| 1.
Port's name & contact address: |
Port's name: HAI SON PORT
Under: Navy - Ministry of Defence
Port's location: 16°06'04"N - 108°14'03"E
Pilot boarding position: 16°10'N - 108°11'E
Address: 96 Yet Kieu street, Tho Quang ward, Son Tra district,
Da Nang city
Tels. No.: 84.511.3831100 / 3920196
Fax No.: 84.511.3831520 / 3920196
E-mail: haisonx50@gmail.com
|
|
| 2. Management: |
Director |
Mr.
Ha Dang Hoan
Tel: (84) 0905117590 |
Vice
Director, Operations |
Mr. Nguyen Huu Xiet
Tel: (84) 0 983567017 |
Vice
Director, Engineering |
Mr.
Le Manh Thang
Tel: (84.511) 3241890 |
|
Vice
Director, Business |
Mr. Le Viet Hanh
Tel: (84) 0905117590 |
|
3.
Access channel:
- Length 1.85 km.
- Channel depth:-6.0 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 1.0 m.
- Maximum draft: 6.5 m
- Maximum size of vessel accepted: 5,000 GRT. |
| 4. Infrastructure
and equipment: |
.
Berth facilities:
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf
Two way concrete Jetty |
373 m
140 m x 2
|
-6.0 m
-6.0 m |
General cargo/Container/Overlength, overweight cargoes |
|
| . Storage facilities:
Total area : 42,000 m2, of which:
Warehouse/shed : 3,000 m2. Open storage: 39,000 m2, including container yard: 20,000 m2.
Tank: 200 m3
. Major equipment: |
|
Type |
No. |
Capacity |
|
Floating crane |
1 |
90 MT |
| Rubber-tyred
crane |
4 |
5/15/25/50 MT |
| Lift truck |
3 |
1.5/5/12 MT |
| Tug
boat |
2 |
225
HP & 1200 HP |
| Floating
dock |
1 |
4,500MT displacement |
|
Slipway |
1 |
350 MT |
|
| 5. Cargo throughput: |
|
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
| Total |
20,000 MT |
120,554 MT |
80,000 MT |
100,000 MT |
100,000 MT |
120,000 MT |
214,000 MT |
248,000 MT |
| Import |
|
14,446 MT |
Nil |
10,000 MT |
5,000 MT |
10,000 MT |
|
36,000 MT |
| Export |
|
Nil |
Nil |
Nil |
Nil |
Nil |
|
0 |
| Domestic |
|
105,554 MT |
80,000 MT |
90,000 MT |
95,000 MT |
110,000 MT |
214,000 MT |
212,000 MT |
| Container |
|
|
1.805 TEUs |
3.000 TEUs |
4,200 TEUs |
10,000 TEUs |
|
|
| Ship calls |
60 |
72 |
64 |
74 |
100 |
125 |
214 |
200 |
|
|
6. Development
plans:
7. Main services:
Handling cargoes, repairing ships with water displacement up to 5,000 tons, mechanics works. Handling overlength/overweight cargoes up to 80 tons. Supply of water, and electricity. Oil and gas services. Tug assistances to ocean vessels.
|
8. Computer system:
36 PCs, applied in wages and personnel management, and programming for motor load test.
|
|