North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
 
 
 

KY HA - QUANG NAM PORT
1. Port's name & contact address:


Port's name: BRANCH OF KY HA CHU LAI QUANG NAM INVESTMENT AND DEVELOPMENT COMPANY LIMITED – KY HA PORT ENTERPRISE
Under: The People’s Committee of Quang Nam Province
Port's location: 15°28'44"N - 108°41'03.5E
Pilot boarding position: 15°29'5"N - 108°41'7"E
Address: Tam Quang commune, Nui Thanh district, Quang Nam province
Tel.: (84.510) 3550777 - 3550108       
Fax: (84.510) 550108 / 872787                  
E-mail: kyhaport@dng.vnn.vn; kyhaport@gmail.com


2. Management:

Director
Mr. Vo Phuoc Long
Tel: (84) 913.499675
Vice Director Mr. Ninh Van Tri
Tel: (84) 982.776777
3. Access channel:

- Length: 5 km.
- Channel depth: -7.0 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 1.2 m.
- Maximum draft: -7.8 m
- Maximum size of vessel accepted: 12,000 DWT
4. Infrastructure and equipment:
. Berth facilities:

Name/No.

Length

Depth alongside
Vessel/Cargo
 
Wharf No.2
160 m
-8.2 m
General cargo
. Storage facilities:

Total port area: 45,000 m2, of which:
Warehouse/shed: 3,000 m2. Open storage: 15,000 m2,

. Major equipment:

Type

No.

Capacity

Shore crane 7
20 ~ 80 MT
Forklift 3
3~4.5  MT
Tractor 7
30~70 MT
Tug boat 1
530HP
Scale bridge 1
60 MT
Grab 4
1~2 M3
Excavator 3 2.5 M3
5. Cargo throughput
2004 2005 2006 2007 2008 2009 2010 2011
Total 70,000 MT 105,000 MT 300,000 MT 530,000 MT 400,000 MT 40,000 MT 594,000 MT 680,000 MT
Import 7,000 MT 10,000 MT 5,200 MT 10,000 MT 100,000 MT   55,000 MT 34,000 MT
Export 13,000 MT 80,000 MT 210,000 MT 350,000 MT 177,000 MT   163,000 MT 210,000 MT
Domestic 50,000 MT 15,000 MT 84,800 MT 170,000 MT 123,000 MT 40,000 MT 376,000 MT 436,000 MT
Container     3,500 TEUs 5,000 TEUs 6,115 TEUs 10,000 TEUs 24,774 TEUs 28,041 TEUs
Ship calls 94 100 230 317 220 200 256 249
6. Development Plans


Project/Planning

Total cost of investment

Implementation

Upgrading the wharf

 

VND 400 bilion

2013

Upgrading the 4 warehouses

VND 10 billion

2012

7. Main services:

  • Cargo handling.
  • Warehouse leasing
  • Tug boat service
  • Freshwater supply

8. Computer system:

15 high-configuration PCs installed with dedicated softwares

 

 