NHA TRANG PORT |
| 1.
Port's name & contact address: |
Port's name: Nha Trang Port Holding Limited Liability company
Under: Vietnam Maritime Administration
Port's location: 12°12'N - 109°13'E
Pilot boarding position: 12°14'5"N - 109°18'7"E
& 12°10'2"N - 109°15'5"E
Address: 5 Tran Phu street, Vinh Nguyen ward, Nha Trang
city, Khanh Hoa province
Tels. No.: 84.58.3590021 / 3590022
Fax No.: 84.58.3590017
E-mail: nhatrangport@dng.vnn.vn
Website: www.nhatrangport.com.vn
|
Mr. Mai Quy Nhu |
| 2. Management |
Director |
Mr.
Mai Quy Nhu
Tel: (84).903516814 |
Vice
Director, Engineering |
Mr.
Mai Dinh Vu
Tel: (84).91406284 |
|
3.
Access channel:
- Length 5 km.
- Channel depth: 11.1m.
- Tidal regime: diurnal.
- Average tidal range: 1.4 m.
- Maximum draft: -11.8 m
- Maximum size of vessel accepted: 20,000 DWT cargo vessel, 240m long passenger vessel
|
| 4. Infrastructure
and equipment: |
.
Berth facilities:
Name/No. |
Length |
Depth alongside |
Northern access pier, No.1
Main wharf, No.2
Jetty wharf – outer side, No.3
Jetty wharf – inner side, No.4
Main wharf – inner side, No.5 |
60 m
156 m
215 m
181 m
120 m |
-4.5 m
-9.0 m
-11.8 m
-8.5 m
-4.5 m |
|
. Storage facilities:
Total port area: 80,000 m2,
of which:
Warehouse/shed: 16,380 m2.
Open storage: 50,000 m2.
. Major equipment: |
|
Type |
No. |
Capacity |
| Shore crane |
12 |
5-60 MT |
| Forklift |
1 |
5 MT |
| Tug boat |
3 |
7-1000HP |
| Truck |
4 |
|
| Excavator/bulldozer |
1 |
|
|
| 5. Cargo throughput: |
|
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
| Total |
647,267 MT |
615,222 MT |
671,000 MT |
1,077,800 MT |
1,227,844 MT |
1,172,144 MT |
1,333,446 MT |
| Import |
19,355 MT |
16,041 MT |
15,000 MT |
6,250 MT |
5,000 MT |
15,139 MT |
29,526 MT |
| Export |
96,521 MT |
101,817 MT |
110,000 MT |
157,288 MT |
253,335 MT |
210,920 MT |
394,994 MT |
| Domestic |
531,391 MT |
487,494 MT |
546,000 MT |
914,262 MT |
969,509 MT |
946,085 MT |
908,926 MT |
| Container |
|
|
4,230 TEUs |
4,819 TEUs |
4,556 TEUs |
4,322 TEUs |
3,942 TEUs |
| Ship calls |
467 |
417 |
497 |
658 |
681 |
648 |
688 |
6. Development plan:
|
Project |
Total cost of investment |
Implementation |
| Project of port upgrading and expansion |
VND 149 biliion |
- completed phase I in 2002 with the investment cost of VND 60 billion.
- Phase II ispending capital to implement the 2 packages No. 4A and 4B: construction of office building, warehouse, open storage, etc. |
|
|
|
|
7. Main services:
Cargo handling, tallying, transporting, warehousing. Tug assistances to vessels calling in or departing from the port area. Cruise and passenger services both international and domestic. Leasing out warehouses and handling equipment, ...
|
8. Computer system
20 PCs linked to apply in port operations, office management, and statistics
|
|