HAI PHONG PORT |
| 1.
Port's name & contact address: |
Port's name: HAI PHONG
PORT
Under: Vietnam National Shipping Lines
Port's location: 20o52'N - 106o41'E
Pilot boarding position: 20o40'N - 106o51'E
Address: 8A Tran Phu street, Hai Phong
city
Tels. No.: 84.31.3859945 / 859456
Fax
No.: 84.31.3552049 / 3859973
E-mail: haiphongport@hn.vnn.vn
Website: www.haiphongport.com.vn |

Mr Nguyen Hung Viet |
| 2. Management |
| President |
Mr. Duong Thanh Binh
Tel: (84.31) 3859906 |
|
General Director |
Mr. Nguyen Hung Viet
Tel: (84.31)
3859953 |
|
Vice director (Operations) |
Mr Truong Van Thai
Tel: (84.31)
3859906 |
|
Vice director (Engineering) |
Mr Cao Duc Van
Tel: (84.31) 3859805 |
| Vice director (Administration) |
Mr. Bui Chien Thang
Tel: (84.31) 3859940 |
|
3.
Access channel:
Channel depth: From pilot boarding position to Dinh Vu Port area: -7.2 m, from Dinh Vu Port to the main port area - Hoang Dieu and Chua Ve Terminals: -5.5m. Tidal regime: diurnal. Average tidal range: 2.5m. Maximum tidal oscillation: 4.0m. Maximum draft: -8.5m.
M
aximum size of vessel acceptable: 10,000DWT at alongside wharf), 40.000 DWT at lighterage area. |
4. Infrastructure
and equipment:
|
. Berth facilities:
Berth name/No. |
Length |
Depth |
Equipment |
Vessel/Cargo |
Main port area – Hoang Dieu Terminal |
M1 |
125 m |
-8.4 m |
- Shore cranes 5MT, 10MT, 16MT, 32MT.
- Floating cranes 10~80MT
- Forklifts
- Automatic bagging line
- Electronic scale 80~120MT |
General cargo, container, bag, bulk vessels |
M2 |
125 m |
-8.4 m |
M3 |
163 m |
-8.4 m |
M4 |
165 m |
-8.4 m |
M5 |
165 m |
-8.4 m |
M6 |
165 m |
-8.4 m |
M7 |
163 m |
-8.4 m |
M8 |
163 m |
-8.4 m |
M9 |
163 m |
-8.4 m |
M10 |
158 m |
-8.4 m |
M11 |
158 m |
-8.4 m |
Chua Ve Terminal |
C1 |
132 m |
-8.4 m |
- Shore crane 40MT
- Gantry crane 32MT
- Dedicated forklifts 2~42MT
- Elect. scale 80MT |
Container, general cargo vessels |
C2 |
132 m |
-8.4 m |
C3 |
150 m |
-8.4 m |
C4 |
150 m |
-8.4 m |
C5 |
150 m |
-8.4 m |
Dinh Vu port area – Tan Cảng Hai Phong |
ĐV3 |
230 m |
-10.5 m |
- Jib/Slewing crane 40MT
- Quayside gantry crane |
Container, general cargo vessels 20,000DWT/1,200TEUs |
ĐV4 |
230 m |
-10.5 m |
ĐV5 |
230 m |
-10.5 m |
ĐV6 |
230 m |
-10.5 m |
ĐV7 |
215 m |
-10.5 m |
|
. Storage facilities:
Warehouse/shed: 51,202 m2 of which CFS: 6,620m2.
Open storage: 598,000 m2, of which CY: 404,400m2.
Storage capacity: 220.000 tấn (MT), of which CY: 21.000 TEU
. Major equipment:
|
|
Type |
No. |
Capacity |
|
Floating crane |
1 |
80 MT |
| Quayside gantry crane |
8 |
35.6~40 MT |
| Rubber-tyred gantry crane - RTG |
12 |
35.6 MT |
| Jib/Slewing crane |
38 |
5~40 MT |
| Forklift/Toplift/Reach stacker |
66 |
3~45 MT |
| Rubber-tyred crane |
6 |
25~50 MT |
| Computerized
scale bridge |
4 |
80~120 MT |
| Tug
boat |
9 |
510 HP~3200 HP |
| Mobile crane |
10 |
25-50 MT |
|
| 5. Cargo throughput: |
|
2004 |
2005 |
2006 |
2008 |
2009 |
2010 |
2011 |
| Total |
10,500,000
MT |
10,511,000
MT |
11,151,000 MT
|
13,900,000 MT |
14,370,000 MT |
15,688,689 MT |
17,891,568 MT |
| Import |
5,370,000
MT |
5,370,000
MT |
5,199,000 MT |
7,635,000 MT |
8,226,000 MT |
7,815,129 MT |
7,861,456 MT |
| Export |
1,800,000
MT |
1,911,000
MT |
2,825,000 MT |
3,231,001 MT |
2,376,000 MT |
2,858,577 MT |
3,989,431 MT |
| Domestic |
3,300,000
MT |
3,230,000
MT |
3,127,000 MT
| 3,103,000 MT
| 3,768,000 MT
| 5,014,983 MT
| 6,040,681 MT
|
| Container |
398,300
TEUs |
424,128
TEUs |
464,000 TEUs |
808,000 TEUs |
816,000 TEUs |
953,646 TEUs |
1,018,794 TEUs |
| Ship calls |
2,430 |
2,430 |
2,056 |
4,779 |
4,779 |
5,298 |
2,470 |
|
|
| 6. Development
Plans |
Project |
Total cost of investment |
Implementation |
Project of Dinh Vu Port – Phase II
|
VND 1,500 billion |
2005-2012.
The project of 4 berths completed with 4 wharves No.3, 4, 5, and 6, service infrastructure is being under construction).
|
Project of Dinh Vu Port – Phase III
|
VND 300 billion |
2011-2012.
Including 1 berth to be started 01 Jan. 2011. |
Purchase of handling equipment |
VND 245.9 billion |
2012 |
|
|
7. Main services:
Cargo handling, baging/packing, tallying and warehousing.
Tug assistance and maritime salvages to ocean vessels.
Cargo transit and container transshipment services.
Transport agent and forwarding.
Logistics services of container transport by Hai Phong-Lao Cai rail-way route.
On-land and by-waterway transport.
Ship agent and maritime brokerage.
|
8. Computer system:
11 servers, 400 work-stations. Cisco network equipments all are assembled throughout the port area by cable network wireless 54 Mbps, STP cables, UTP cables, bronze cables. Current softwares: Container Terminal Management System – CTMS, Management Information Systems – MIS, camera system, security gate management and control system, internal document management system
|
|