VAT CACH PORT |
| 1.
Port's name & contact address: |
VAT CACH PORT JOINT-STOCK COMPANY
Under: Vietnam National Shipping Lines
Port's location: 20°53'16"N - 106°36'48"E
Pilot boarding position: 20°40' N - 106°51'E
Add.: 9th Km, National Road No.5, Quan Toan ward, Hong
Bang district, Hai Phong city.
Tel: (84.31) 3850018–3850026
Fax: (84.31) 3850018–3850026
E-mail: vatcachport@vnn.vn |
|
| 2. Management |
|
Chairman of the Board, Director |
Mr. PHAM VAN SON
Tel: (84.31) 3850018 |
|
Vice Director (Engineering) |
Mr. HOANG VAN DOAN
Tel: (84.31) 3850323 |
Vice Director (Operations) |
Mr. NGUYEN VAN PHUC
Tel: 84.31.3748574 |
|
3.
Access channel:
Length 20 km. Channel depth:-3.7m. Tidal regime: diurnal. Average tidal range: 1.2 m. Maximum draft: 3.7m – 3,3m. Maximum size of vessel accepted: 3,000 DWT
|
| 4. Infrastructure
and equipment: |
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf No.1
Wharf No.2
Wharf No.3
Wharf No.4 +5
Wharf No.6 |
62 m
96 m
96 m
125 m
106 m |
-4.5 m
-4.5 m
-4.5 m
-4.0 m
-4.7 m |
General cargo
-ditto-
General cargo
General+Liquid
General cargo
|
|
. Storage facilities:
Total port area: 210,000 m2
Warehouse/shed: 21,000 m2. Open storage: 130,000 m2, of which container yard: 12,000 m2.
. Major equuipment: |
|
Type |
No. |
Capacity |
|
Shore crane |
11 |
5 ~ 36 MT |
|
Forklift |
4 |
4 ~ 7 MT |
|
Truck |
9 |
5 ~ 16 MT |
|
Excavator |
1 |
|
|
| 5. Cargo throughput: |
|
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
| Total |
900,000 MT |
1,150,000 MT |
1,300,000 MT |
1,370,000
MT |
1,650,000 MT |
1,500,647 MT |
1,323,373 MT |
| Import |
0 MT |
5,000 MT |
4,000 MT |
0 |
2,600 MT |
|
61,886 MT |
| Export |
0 MT |
0 MT |
Nil |
0 |
12,500 MT |
|
3,049 MT |
| Domestic |
900,000 MT |
1,145,000 MT |
1,296,000 MT |
1,370,000
MT |
1,634,900 MT |
1,500,647 MT |
1,258,438 MT |
| Ship calls |
589 |
689 |
895 |
997 |
997 |
997 |
708 |
|
|
6. Development
Plans:
|
Project |
Total cost of investment |
Implementation |
- Building general cargo warehouse
- Purchase 04 vehicles for transportation and admin purposes
- Expand cargo yard |
|
|
|
7. Main services:
- Cargo handling, tallying, and warehousing.
- Multi – Modal Transportation, construction material and gasoline trading.
- Mechanical repair, road and waterway equipment
|
8. Computer system:
30 PCs applied in port operations and management.
|
|