North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> My Thoi Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

 
 
 

DONG NAI PORT
1. Name and Address

Port's name: DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port's location:
- Long Binh Tan Terminal: 10°54'01"N - 106°50'29"E
- Go Dau A Terminal: 10°39'28"N - 107°01'16"E
- Go Dau B Terminal: 10°37'08"N - 107°01'26"E
Pilot boarding position: 10°20'N - 107°02'E
Main office: Long Binh Tan ward, Bien Hoa city, Dong Nai province
Tel: 84.61.3832225/3831439/3543328
Fax: 84.61.3831259
E-mail: dongnaiport@vnn.vn
Website: www.dongnai-port.com
Go Dau A Terminal office: Phuoc Thai commune, Long Thanh Dist., Dong Nai Pro. Tel: 84.61.3827328
Fax: 84.61.3841252
Go Dau B Terminal office: Phuoc Thai commune, Long Thanh Dist., Dong Nai Pro. Tel: 84.61.3841599
Fax: 84.61.3816790


Mr. NGUYEN THI BACH MAI
2. Management
Chairman of the Board of Management cum D.G. Mr. NGUYEN THI BACH MAI
Tel: 0.61.3831733
Deputy D.G. cum Director of Go Dau A Terminal Mr. PHAM VAN QUYEN
Tel: 0.61.3543328
Vice Chairman of the B.M. cum Deputy D.G. for Engineering Mr. DO VAN SAM
Tel: 0.61.3831803
Member of the B.M. cum Deputy D.G. for Business

Mr. NGUYEN THI KIM CHI
Tel: 84.61. 3831577

3. Access channel:
  • to Long Binh Tan Terminal situated on the Dong Nai river: length 100 km. Channel depth: 4m. Tidal regime: irregular semi-diurnal. Average tidal range: 3.0 m. Maximum draft: 6.2m.Maximum size of vessel accepted: 5,000 DWT.
  • to Go Dau A and Go Dau B Terminals situated on the Thi Vai river: length 35 km. Channel depth: 6.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 4.6 m. Maximum Draft: 11.1m.

    Maximum size of vessel accepted: at Go Dau A wharf: 10,000DWT vessel and Go Dau B: 15,000DWT vessel).




4. Berths :

Name / No.

Length (m)

Depth alongside

Vessel/Cargo

K1 Long Binh Tan 60,2 -7,5
General cargoes
K2 Long Binh Tan 72 -8.3
K3 Long Binh Tan 10 -3.5
K4 Long Binh Tan 20 -3.0
A1 Go Dau 30 -7.5
A3 Go Dau 110 -8.5
Container
B1 Go Dau 72.5 -8.5
General cargoes
B2 Go Dau 120 -9.5
B3 Go Dau 120 -9.5
5. Storage

Total port area: 443,000 m2 (Long Binh Tan: 43,000 m2, Go Dau A: 180,000 m2, Go Dau B: 220,000 m2)
Warehouse/shed: 5,000 m2. Open storage: 80,000 m2. Tank: 3.000 m3
Total storage capacity: 200,000 MT

 

6. Equipments
Type
No.
Capacity
Shore crane 11 25 ~ 70 MT
Forklift 6 5 ~ 10 MT
Tractor 3  
Truck 5  
7. Cargo throughput:
2003 2004 2005 2006 2007 2008 2009
Total 1,420,872 MT 1,620,000 MT 1,612,000 MT 1,814,000 MT 2,922,280 MT 2,803,091 MT 2,365,992 MT
Import 542,954 MT 708,054 MT 763,000 MT 711,506 MT 880,463 MT 720,914 MT 791,814 MT
Export 33,527 MT 53,149 MT 35,000 MT 165,349 MT 973,750 MT 914,8 59MT 529,936 MT
Domestic 844,392 MT 858,797 MT 814,900 MT 937,145 MT 1,068,067 MT 1,167,319 MT 1,044,242 MT
Ship calls 800 800 760 625 775 775 741

8. Development plan:

Project
Cost of investment
Implementation
Long Binh Tan Terminal:    

- Upgrading and transforming 2 wharves for 2,000Dwt vessel into 1 wharf for 5,000Dwt vessel

VND 15 billion 2007-2008
- Land clearance and filling of 3 ha VND 40 billion 2008
- Expanding 15 ha of yard and building 1 wharf for 5,000Dwt vessel VND 250  billion 2010
Go Dau A terminal:    
- Upgrading  and transforming 3,000MT wharf into 10,000MT wharf VND 30 billion 2008
- Purchase of 1 rubber-tyred crane with 100MT lifting capacity VND 6 billion 2008
Go Dau B Terminal:    
- Construction of wharf for 15,000Dwt vessel and warehouse/open storage system in the area of 20-30 ha 5 million US Dollars and 150 billion VN Dong 2009
- Purchase of 2 crane with 40MT lifting capacity for handling container 2 million US Dollars 2009
- Purchase of 2000HP tug boat VND 7 billion 2009

 

9. Main services:

  • Port facilities operations and management
  • Handling & transportting cargoes in or outside the port area
  • Repairs of handling equipment and transportation means
  • Ship agent and maritime services
  • Supplying fuel to vessels/vehicles: petrol, lubricant,...
  • Taxi transporting sevices
  • Trading construction materials: soil, stones, sand, gravel
  • Duty free shop, seamen's club
  • Surveying, designing and constructing communication works
  • Real estate
  • Trading, and importing wood logs, steels, argriculture products except cotton and cashew.
  • Trading and supplying other products/services  being in compliance with law and regulations.



10. Computer systems:

40 PCs
 

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email