NHA TRANG PORT |
| 1.
Port's name & contact address: |
Port's name: NHA TRANG PORT
Under: Vietnam Maritime Administration
Port's location: 12°12'N - 109°13'E
Pilot boarding position: 12°14'5"N - 109°18'7"E
& 12°10'2"N - 109°15'5"E
Address: 5 Tran Phu street, Vinh Nguyen ward, Nha Trang
city, Khanh Hoa province
Tels. No.: 84.58.590021 / 590022 / 590741
Fax No.: 84.58.590017
E-mail: nhatrangport@dng.vnn.vn
Website: www.nhatrangport.com.vn
|
Mr. Mai Quy Nhu |
| 2. Management |
Director |
Mr.
Mai Quy Nhu
Tel: 84.58.590867 |
Vice
Director, Engineering |
Mr.
Mai Dinh Vu
Tel: 84.58.590875 |
|
3.
Access channel:
- Length 5 km.
- Channel depth: 11.1m.
- Tidal regime: diurnal.
- Average tidal range: 1.4 m.
- Maximum draft: -11.8 m
- Maximum size of vessel accepted: 20,000 DWT cargo vessel,
30,000 GRT passenger vessel.
|
| 4. Infrastructure
and equipment: |
.
Berth facilities:
Name/No. |
Length |
Depth alongside |
Northern access pier, No.1
Main wharf, No.2
Jetty wharf – outer side, No.3
Jetty wharf – inner side, No.4
Main wharf – inner side, No.5 |
60 m
156 m
215 m
181 m
120 m |
-4.5 m
-9.0 m
-11.8 m
-8.5 m
-4.5 m |
|
. Storage facilities:
Total port area: 80,000 m2,
of which:
Warehouse/shed: 16,378 m2.
Open storage: 50,000 m2.
. Major equipment: |
|
Type |
No. |
Capacity |
| Shore crane |
12 |
5-60 MT |
| Forklift |
1 |
5 MT |
| Tug boat |
3 |
7-1000HP |
| Truck |
4 |
|
| Excavator/bulldozer |
1 |
|
|
| 5. Cargo throughput: |
|
2002 |
2003 |
2004 |
2005 |
2006 |
2007 |
| Total |
548,043 MT |
647,267 MT |
615,222 MT |
671,000 MT |
1,077,800 MT |
1,227,844 MT |
| Import |
19,406 MT |
19,355 MT |
16,041 MT |
15,000 MT |
6,250 MT |
5,000 MT |
| Export |
92,947 MT |
96,521 MT |
101,817 MT |
110,000 MT |
157,288 MT |
253,335 MT |
| Domestic |
435,690 MT |
531,391 MT |
487,494 MT |
546,000 MT |
914,262 MT |
969,509 MT |
| Container |
|
|
|
4,230 TEUs |
4,819 TEUs |
4,556 TEUs |
| Ship calls |
399 |
467 |
417 |
497 |
658 |
681 |
6. Development plan:
|
Project |
Total cost of investment |
Implementation |
| Project of port upgrading and expansion |
VND 149 biliion |
- completed phase I in 2002 with the investment cost of VND 60 billion.
- Phase II ispending capital to implement the 2 packages No. 4A and 4B: construction of office building, warehouse, open storage, etc. |
|
|
|
|
7. Main services
Cargo handling, tallying, warehousing. Tug assistances to vessels calling in or departing from the port area. Cruise and passenger services both international and domestic. Leasing out warehouses and facilities. Supply of marine services, ...
|
8. Computer system
16 PCs linked to apply in port operations, office management, and statistics
|
|