DONG NAI PORT |
1.
Name and Address
|
Port's
name: DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port's location:
- Long Binh Tan Terminal: 10°54'01"N - 106°50'29"E
- Go Dau A Terminal: 10°39'28"N - 107°01'16"E
- Go Dau B Terminal: 10°37'08"N - 107°01'26"E
Pilot boarding position: 10°20'N - 107°02'E
Main office: Long Binh Tan ward, Bien
Hoa city, Dong Nai province
Tel: 84.61.3832225/3831439/3543328
Fax: 84.61.3831259
E-mail: dongnaiport@vnn.vn
Website: www.dongnai-port.com |

Mr. NGUYEN THI BACH MAI |
| 2. Management |
| General Director |
Mr. NGUYEN THI BACH MAI
Tel: 0.61.3831733 |
| Deputy G.D. for Engineering & Administration |
Mr. DO VAN SAM
Tel: 0.61.3831803 |
| Deputy G.D. for Finance |
Mr. NGUYEN THI KIM CHI
Tel: 84.61. 3831577 |
| Deputy G.D. for Business |
Mr. NGUYEN NGOC TUAN
Tel: (84) 903 851329 |
|
3.
Access channel:
- To Long Binh Tan Terminal situated on the Dong Nai river: length 100 km. Channel depth: 4m. Tidal regime: irregular semi-diurnal. Average tidal range: 3.0 m. Maximum draft: 6.2m.Maximum size of vessel accepted: 5,000 DWT.
- To Go Dau A and Go Dau B Terminals situated on the Thi Vai river: length 35 km. Channel depth: 6.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 4.6 m. Maximum Draft: 11.1m.
Maximum size of vessel accepted: at Go Dau A wharf: 10,000DWT vessel and Go Dau B: 15,000DWT vessel).
|
| 4. Berths : |
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
K1 Long Binh Tan
K2 Long Binh Tan
K3 Long Binh Tan
K4 Long Binh Tan
A1 Go Dau
A3 Go Dau
Expanded A3 Go Dau
B1 Go Dau
B2 Go Dau
B3 Go Dau |
60.2 m
72.0 m
67.8 m
14.0 m
30.0 m
110.0 m
110.0 m
58.0 m
120.0 m
105.0 m |
-3.3 m
-3.6 m
-7.5 m
-3.0 m
-6.4 m
-9.5 m
-9.5 m
-5.0 m
-10.3 m
-10.0 m |
General cargo
ditto
Container
ditto
ditto
ditto
General cargo
ditto
ditto
ditto |
|
5.
Storage
|
| Total port area: 817,526 m2 (Long Binh Tan: 82,686 m2, Go Dau A: 167,383 m2, Go Dau B: 224,667 m2). Warehouse/shed: 5,000 m2. Open storage: 168,000 m2. Tank: 3.000 m3
Total storage capacity: 200,000 MT |
| 6. Equipments |
Type |
No. |
Capacity |
| Shore
crane |
13 |
25
~ 100 MT |
| Forklift |
16 |
5 ~ 25 MT |
| Tractor |
10 |
40 MT |
| Truck |
10 |
|
| RTG |
2 |
40 MT |
| Reach stacker |
3 |
45 MT |
| Electronical scale bridge |
1 |
80 MT |
| Power station |
2 |
750 Kwt |
|
| 7. Cargo throughput: |
|
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
2011 |
| Total |
1,620,000 MT |
1,612,000 MT |
1,814,000 MT |
2,922,280 MT |
2,803,091 MT |
2,365,992 MT |
2,342,738 MT |
2,686,706 MT |
| Import |
708,054 MT |
763,000 MT |
711,506 MT |
880,463 MT |
720,914 MT |
791,814 MT |
847,808 MT |
904,905 MT |
| Export |
53,149 MT |
35,000 MT |
165,349 MT |
973,750 MT |
914,8 59MT |
529,936 MT |
188,193 MT |
321,458 MT |
| Domestic |
858,797 MT |
814,900 MT |
937,145 MT |
1,068,067 MT |
1,167,319 MT |
1,044,242 MT |
1,306,737 MT |
1,460,343 MT |
| Container |
|
|
|
|
|
|
|
3,091 TEUs |
| Ship calls |
800 |
760 |
625 |
775 |
775 |
741 |
2,122 |
1,123 |
|
8. Development
plan:
Project |
Cost of investment |
Implementation |
- Expanding Dong Nai Port/Long Binh Tan Terminal, Phase I |
VND 126.8 billion |
2008-2015 |
- Investing in the constructions of Go Dau A Terminal
|
129.7 billion VN Dong |
2011-2012
|
- Expanding Go Dau B Terminal, Phase I
|
VND 342.9 billion |
2012 |
- Expanding Go Dau B Terminal, Phase II |
VND 419.6 billion |
2012-2014 |
9. Main services: |
- Port facilities operations and management
- Handling & transportting cargoes in or outside the port area
- Repairs of handling equipment and transportation means
- Ship agent and maritime services
- Supplying fuel to vessels/vehicles: petrol, lubricant,...
- Taxi transporting sevices
- Trading construction materials: soil, stones, sand, gravel
- Duty free shop, seamen's club
- Surveying, designing and constructing communication works
- Real estate
- Trading, and importing wood logs, steels, argriculture products except cotton and cashew.
- Trading and supplying other products/services being in compliance with law and regulations.
|
10.
Computer systems:
100 PCs + 3 servers |
| |
|