Trang chủ / QUANG NINH PORT

QUANG NINH PORT

1. Port’s name & contact address

Mr. BUI QUANG DAO

Port’s name:
QUẢNG NINH PORT J.S. CO.
Under: Vietnam National Shipping Lines
Ports location: 20o02’35”E
Pilot boarding position: 20o43’04”N – 107o10’33”E
Add: 1 Cái Lân str, Bãi Cháy ward, Hạ Long city, Quảng Ninh Pro.
Tel: (84.33) 3 825 627
Fax: (84.33) 3 826 118
Email: qnp@quangninhport.com.vn
Website: www.quangninhport.com.vn

2. Management

General Director Mr Bui Quang Dao
Deputy Director Mr Hoang Trong Tung
Deputy Director Mr Quach Dinh Phu
Deputy Director Mr Dinh Anh Tuan

3. Access channel

Length:36 km, consisting of 2 sections:
From Buoy 0 to Hon Mot islet: 22,5 km, channel depth: 13m-20m
From Hon Mot to Cai Lan Port: 10,5 km, channel depth: -10m
Tidal regime: diurnal. Average tidal range 3,2m. Maximum size of vessel accepted: 75.000 DWT

4. Infrastructure and equipment

Name/No.

Length

Depth alongside

Vessel/Cargo

Wharf No. 1     166 m       -9.0 m Bulk/General cargo
Wharves No.5,6,7     680 m     -12.0 m Container/General cargo
Cai Lan sub-wharf     80 m       -5.0 m Coal/Wood log/Construction materials

Storage facilities:

  • Warehouse/shed: 14,200 m2 , of which CFS: 4,600 m2
  • Yard: 142,000 m2 trong đo bãi chứa côngten-nơ 49.000m2

Major equuipment:

Type No. Capacity

Quayside gantry crane

02 40 MT

Harbour mobile crane

02 64 & 100 MT

Rubber-tyred gantry crane

04 50 MT/5+1 & 7+1 high
Jib/rubber-tyred crane
09 10 – 40 MT
MT container lifter
02 7 MT /5 high
Folklift
31 1.5 – 8 MT
Tractor
07
Container tractor 11
Scale
05 65 – 80 MT
Buldozer, excavator
  18 1.25 – 16 m3

Bagging hopper

06 10m3
Tug boat 02 1,260HP & 3,200HP

5. Cargo throughput

2013 2014 2015
Total 5.033,735 MT 6,425%,280 MT 6,332,109 MT
Import 1,402,548 MT 3,269,169 MT. 3,074,226 MT
Export 2,905,051 MT 1,871,947 MT 1,440,636 MT
Domestic 726,136 MT 1,326,164 MT 1,817,247 MT
Container 28,013 TEUs 3,227 TEUs
Ship calls 335 316 391

6. Development Plans

Project

Total investment

Implementation

– Levelling of hill forward up-stream Cai Lan terminal, stage II VND 9.7 billion 1st & 2nd quarters of 2015
– Purchase of 2 hoppers and 2 remote-control grabs VND 6 billion 2nd quarter of 2015
– Purchase of 1 bulldozer and 2 excavators VND 6 billion 3rd quarter of 2015
– Construction of sub-wharf at down-stream berth No.7 VND 30 billion
– Others VND 5 billion 2015

7. Main services

  • Cargo handling, tallying and transporting. Warelousing and other maritime services. Agents and retail trade of petroleum. On-land and by-waterway domestic transports .
  • CTMS, GTOS.