CUA CAM |
| 1.
Port's name & contact address: |
Port's name: CUA CAM PORT JOINT-STOCK COMPANY
Under: Hai Phong City's Dept. of Transport
and Public Works
Port's location: 20°52'N - 106°41'E
Pilot boarding position: 20°40'N - 106°51'E
Address: 2 Ngo Quyen street, Ngo Quyen
district, Hai Phong city
Tels. No.: (84.31) 3837391
Fax No.: (84.31) 3837393
E-mail: camporthp1@gmail.com
|

Mr. Hoang Dinh Dat |
2. Management:
|
|
Director |
Mr.
Hoang Dinh Dat
Tel: 84.31.3768091 |
|
Vice Director, Operations |
Mr. Nguyen Hy
Lap
Tel: 84.31.3654072 |
Vice
Director, Administration |
Mr.
Nguyen Ngoc Vung
Tel: 84.31.3827037 |
|
3.
Access channel:
Length 20 km. Channel depth: -5.0 m. Tidal regime: diurnal. Average tidal range: 2.5 m.
Maximum draft: 7.1 m.
Maximum size of vessel accepted: 7,000 DWT
|
4. Infrastructure
and equipment:
|
. Berth facilities:
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf No.1
Wharf No.2
Wharf No.3
Wharf No.4 |
75 m
120 m
75 m
78 m |
-5.0 m
-7.0 m
-5.0 m
-2.5 m |
General cargo, vessel 5000DWT
General cargo / container, vessel 7000DWT
General / Liquid cargoes, vessel 5000DWT |
|
. Storage facilities:
Total port area: 27,000 m2
Open storage: 25,000 m2, of which container yard: 11,000 m2. Tank: 1,800 m2. Total capacity: 500.000MT
. Major equipment:
|
|
Type |
No. |
Capacity |
|
Shore crane |
4 |
7.5-16 MT |
| Rubber-tyred Crane |
4 |
16 – 36 MT |
| Crawler crane |
1 |
25 MT |
|
| 5. Cargo throughput: |
|
2003 |
2000 |
2005 |
2006 |
2007 |
2008 |
2009 |
| Total |
220,000 MT |
35,250 MT |
380,000 MT |
320,440 MT |
462,734 MT |
566,000 MT |
530,000 MT |
| Import |
65,000 MT |
12,500 MT |
130,000 MT |
33,200
MT |
51,416 MT |
126,000 MT |
120,000 MT |
| Export |
12,000 MT |
1,350 MT |
Nil |
240
MT |
48,412 MT |
80.000 MT |
0 |
| Domestic |
143,000 MT |
21,400 MT |
250,000 MT |
287,000 MT |
362,906 MT |
360.000 MT |
410,000 MT |
| Container |
800 Teus |
200 Teus |
7,000 TEUs |
|
|
|
|
| Ship calls |
240 |
118 |
210 |
230 |
490 |
439 |
400 |
|
|
| 6. Development
Plans |
Project |
Total cost of investment |
Implementation |
02 forklift |
1.5 billion VND |
2009 |
Upgrade yetty 1 and install rail for the bottom of crane |
1.5 billion VND |
First quarter – 2009 |
Jib crane: 25-30 Mt |
8 tỷ |
2009 |
Upgrade yard surface phase 2 |
2.5 tỷ |
First quarter – 2009 |
|
|
7. Main services:
- Cargo handling.
- Warehousing
- Maritime service
- Shipping repair
- Fresh water and equipment supply.
|
8. Computer system:
10 PCs applied in management of information and operations.
|
|