North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

 
 
 

THANH HOA PORT
1. Port's name & contact address:

Port's name: THANH HOA PORT LIMITED COMPANY
Under: The people' s Commmittee of Thanh Hoa Province
Port's location:
. Nghi Son terminal: 19°18'20"N - 105°49'00"E
Nghi Son commune, Tinh Gia district, Thanh Hoa province.
Tel: 84.37.3862237
Fax: 0.37.3862373
Pilot boarding position: 19°17'01"N - 105°49'50"E

. Le Mon terminal: 19°48'00"N - 105°49'00"E
Quang Hung commune, Thanh Hoa city, Thanh Hoa province.
Tel: 0.37.3910062
Pilot boarding position: 19°47'01"N - 105°49'58"E
Head off.: Nghi Son commune, Tinh Gia district, Thanh Hoa province
Tel: 84.37.3613073 / 3613074   
Fax: 84.37.3613075
Email: thanhhoaport@gmail.com



Mr. Le Anh Dung
2. Management
Chairman of the Co. cum Director
Mr. Le Anh Dung
Tel: 84.37.3613073
Vice Director
Mr. Nguyen Danh Che  
Tel: (84.37) 3910062

3. Access channel:

  • Access to Nghi Son Termina): 2 km. Depth: -8.5 m. Maximum draft: 8.5 m
  • Access to Le Mon Terminal: 16 km. Depth: -0.8 m. Maximum draft: 3.2 m
  • Tidal regime: irregular diurnal. Average tidal range: -2.5 m.
  • Maximum size of vessel accepted: at Nghi Son Terminal: 20,000 DWT, at Le Mon Terminal: 1,000 DWT.



4. Infrastructure and equipment:


. Berth facilities:

Name/No.

Length

Depth alongside

Vessel/Cargo

Nghi Son Terminal:

  . Wharf No.1

  . Wharf No.2

Le Mon Terminal:

  . Wharf No.1-2

  . Wharf No.3-4

 

   165 m

   225 m

 

   113 m

  98 m

 

  -8.5 m

-11.0 m

 

  -5.0 m

  -5.0 m

 

General cargoes
-nt-

 

General cargoes
-nt-


. Storage facilities:

Total area: 161,000 m2 (Nghi Son: 110,000 m2, Le Mon: 51,000 m2).

  • Nghi Son Terminal: Warehouse/shed: 2,880 m2. CFS: 1,440 m 2
    Open storage: 72,000 m2, of which container yard: 12,350 m2.
  • Le Mon Terminal: Warehouse/shed: 5,200 m2. Open storage: 25,000 m2.
. Major equipment:

Type

No.

Capacity

Nghi Son Le Mon
Shore crane 10 4
12 ~ 50 MT
Forklift truck 2 3
4 ~ 7 MT
Excavator 1  
1.7 m3
Truck   2
10 MT
Electronics scale bridge   1
80 MT
Japanese Chain-tyred crane 6 1 35 – 50 MT
Russian Kamaz truck   2 10 MT
Russian Rubber-tyred crane 2 1 12 – 16MT
Crawler crane   3 12 - 20 MT
5. Cargo throughput:
2004 2005 2006 2007 2008 2009 2010
Total 1,192,000 MT 1,075,971 MT 1,155,121 MT 1,750,000 MT 1,527,000 MT 282,000 MT 246,000 MT
Import nil nil 900 MT 5,600 MT 20,000 MT 20,000 MT 0
Export 170,000 MT 15,212 MT 58,571 MT 262,000 MT 100,000 MT 4,700 MT 4,000 MT
Domestic 1,022,000 MT 1,060,759 MT 1,095,650 MT 1,482,400 MT 1,407,000 MT 257,300 MT 242,000 MT
Ship calls 1,688 915 917 1,140 1,344 443 386

6. Development Plans:

 

Project

Total cost of investment

Implementation

Equip 01 tugboat

 

VND 15 billion

 

2009-2010

Purchase of 1 shore crane with lifting capacity of 55-65 MT

VND 6.5 billion

 

2009

Electronic scale of 100 MT for Nghi Son terminal

VND 0.7 billion

 

Folklift >10MT for Nghi Son Port

VND 2 billion

 


 

7. Main services:

Cargo handling. Warehouse rental. Delivery and receipt of cargo, Tug assistance to vessels entering or departing from the port. Supply of fuel, electricity, foods. Repairs of vessels and boats. Coal trading,....


8. Computer system:

14 PC, applied in port operations and management.


 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email