North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> My Thoi Port
>

VICT Port

> Can Tho ship industry and transport
>

Interflour Cai Mep

 
 
 

CAN THO PORT
1. Name and Address

Port's name: CAN THO PORT
Under: Vietnam national Shipping Lines
Port's location: 10°03'N - 105°42'E
Pilot boarding position: 09°28'36"N - 106°30'34"E
Address: 27 Le Hong Phong street, Tra Noc ward, Binh Thuy district, Can Tho city
Tels. No.: (84.710) 3841251 / 3841252 / 3841937
Fax No.: (84.710) 3841247 / 3842642
E-mail: linhtoan19@yahoo.com


Mr. PHAN THANH TIEN
2. Management
Director Mr. PHAN THANH TIEN
Tel: (84.71) 3841251
Vice director , Administration Mr. NGUYEN QUOC THONG
Tel: 84.71.3842779
Vice Director, Operations Mr. PHAN CONG DUC
Tel: 84.71.3841252
3. Access channel:

Length: nautical miles. Channel depth: 7.5 m. Tidal regime: semi-diurnal.
Average tidal range: 3.0-4.0 m. Maximum draft: -7.5 m
Maximum size of vessel accepted: 10,000 DWT.

4. Berths :

designation

Length (m)

Depth alongside

Vessel/Cargo

Wharf A 144 -9

General cargo,15.000DWT

Wharf B 160 -9
5. Storage

Total port area: 60,000 m2
Warehouse/shed: 10,910 m2, of which bonded warehoouse: 500 m2.
Open storage: 29,900 m2, of which container yard: 19,000 m2.
Total storage capacity: 160.000 MT

6. Equipments
Type
No.
Capacity
Shore crane, floating crane 13 2 ~ 40 MT
Forklift truck 10 2.5 ~ 10 MT
Reach stacker 2 15 - 40 MT
Tugboat 4 350 - 1200HP
Container  Tractor 7 15 - 45MT
Barge 5 300 T – 600 T
Chassis 13  
Tipper truck    
7. Cargo throughput:
2002 2003 2004 2005 2006 2007 2008
Total 443,980 MT 637,619 MT 1,058,378 MT 1,145,289 MT 875,531 MT 1,305,952 MT 2,843,098 MT
Import 72,276 MT 57,217 MT 128,633 MT 538,530 MT 285,836 MT 211,123 MT 262,924 MT
Export 97,234 MT 185,146 MT 69,167 MT 54,712 MT 52,606 MT 413,017 MT 2,074,475 MT
Domestic 274,470 MT 395,256 MT 860,578 MT 552,047 MT 537,089 MT 681,812 MT 505,699 MT
Container 8,595 TEUs 11,223 TEUs 15,880 TUEs 18,370 TEUs 17,097 TEUs 21,132 TEUs 10,692 TEUs
Ship calls 86 189 184 210 159 271 1,388

8. Main services :

Project

Total cost of investment

Implementation

Upgrade and install the rail (for B wharf of 160 m long) to install Gantry crane for container handling

 

VND 15 billion

 

2009

Infrastructure leasing and build barrier fopr handling area of Tra Noc 2 industrial zone to handle container

 

VND 08 billion

 

 

2009

Equip 03 crane for port stevedoring and for production and works beyond port

 

VND 50 billion

 

2009

Make new barge of 500 MT

VND 50 billion

2009

Make new barge of 1000 MT

VND 04 billion

2009

 

9. Main services :

  • Cargo handling, tallying,  transporting, warehousing. Container stuffing/unstuffing.Warehouse and yard leasing. Tug assistance and  ship-chandler services, ..
  • Port operation, ship repairing, maritime broker services.
  • Marine labor supply for domestic and foreign market
  • waterway and land transportation business
  • recreation and entertainment services
  • forwarding agency, whole and retail saling, duty free business, shipping supply.
  • Import material for the maritime section.
  • supporting activities for transportation.
  • bonded warehouse businesses, specified information.
  • tourism service.
  • house leasing for business purposes.
  • dredging bed of the river, lake according to the signed contract.
  • petrolium retail saling.

 

10. Computer system
40 PCs, applied in port operations and management
LAYOUT

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email