VAT CACH PORT |
| 1.
Port's name & contact address: |
VAT CACH PORT JOINT-STOCK COMPANY
Under: Vietnam National Shipping Lines
Port's location: 20°53'16"N - 106°36'48"E
Pilot boarding position: 20°40' N - 106°51'E
Add.: 9th Km, National Road No.5, Quan Toan ward, Hong
Bang district, Hai Phong city.
Tel: (84.31) 3850018–3850026
Fax: (84.31) 3850018–3850026
E-mail: vatcachport@vnn.vn |
|
| 2. Management |
Director |
Mr. Tran Duy Phuc
Tel: (84) 912.811586 |
| Vice Director, Operations |
Mr. Nguyen Van Phuc
Tel: (84) 913.304108 |
|
3.
Access channel:
Length 20 km. Channel depth:-3.7m. Tidal regime: diurnal. Average tidal range: 1.2 m. Maximum draft:-7.0m. Maximum size of vessel accepted: 3,000 DWT
|
| 4. Infrastructure
and equipment: |
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Wharf No.1
Wharf No.2
Wharf No.3
Wharf No.4 +5
Wharf No.6 |
62 m
96 m
96 m
125 m
106 m |
-4.5 m
-4.5 m
-4.5 m
-4.0 m
-4.7 m |
General cargo
General cargo
General cargo
General+Liquid
General cargo
|
|
. Storage facilities:
Total port area: 210,000 m2
Warehouse/shed: 21,000 m2. Open storage: 130,000 m2, of which container yard: 12,000 m2.
. Major equuipment: |
|
Type |
No. |
Capacity |
|
Shore crane |
14 |
5 ~ 45 MT |
|
Forklift |
4 |
4 ~ 7 MT |
|
Truck |
9 |
5 ~ 16 MT |
|
Excavator |
2 |
0.5 M3 |
|
| 5. Cargo throughput: |
|
2006 |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
| Total |
1,370,000
MT |
1,650,000 MT |
1,500,647 MT |
1,323,373 MT |
1,267,985 MT |
1,564,227 MT |
1,630,776 MT |
| Import |
0 |
2,600 MT |
|
61,886 MT |
17,166 MT |
11,227 MT |
52,286 MT |
| Export |
0 |
12,500 MT |
|
3,049 MT |
2,641 MT |
0 |
13,087 MT |
| Domestic |
1,370,000
MT |
1,634,900 MT |
1,500,647 MT |
1,258,438 MT |
1,248,178 MT |
1,553,000 MT |
1,565,403 MT |
| Ship calls |
997 |
997 |
997 |
708 |
660 |
500 |
668 |
|
|
6. Development
Plans:
|
Project |
Total cost of investment |
Implementation |
Purchasing1 quayside-fixed crane with 45MT
lifting capacity and 30m outreach |
|
|
VND 30 billion |
2015 |
|
|
|
7. Main services:
- Cargo handling, tallying, and warehousing.
- Multi – Modal Transportation, construction material and gasoline trading.
- Mechanical repair, road and waterway equipment
|
8. Computer system:
50 PCs applied in LAN system and other pro softwares
|
|