North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
 
 
 

HAI PHONG PORT
1. Port's name & contact address:

 

Port's name: HAI PHONG PORT
Under: Vietnam National Shipping Lines
Port's location: 20o52'N - 106o41'E
Pilot boarding position: 20o40'N - 106o51'E
Address: 8A Tran Phu street, Hai Phong city
Tels. No.: 84.31.3859945 / 859456
Fax No
.: 84.31.3552049 / 3859973
E-mail: haiphongport@hn.vnn.vn
Website: www.haiphongport.com.vn


Mr Nguyen Hung Viet
2. Management
President Mr. Duong Thanh Binh                    
Tel: (84.31) 3859906
General Director Mr. Nguyen Hung Viet
Tel: (84.31) 3859953
Vice director (Operations) Mr Truong Van Thai
Tel: (84.31) 3859906
Vice director (Engineering) Mr Cao Duc Van
Tel: (84.31) 3859805
Vice director (Administration) Mr. Bui Chien Thang
Tel: (84.31) 3859940
3. Access channel:

Channel depth: From pilot boarding position to Dinh Vu Port area: -7.2 m, from Dinh Vu Port to the main port area - Hoang Dieu and Chua Ve Terminals: -5.5m. Tidal regime: diurnal. Average tidal range: 2.5m. Maximum tidal oscillation: 4.0m. Maximum draft: -8.5m.
M aximum size of vessel acceptable: 10,000DWT at alongside wharf), 40.000 DWT at lighterage area.

4. Infrastructure and equipment:

. Berth facilities:

Berth name/No.

Length

Depth

Equipment

Vessel/Cargo

 

Main port area – Hoang Dieu Terminal

M1

125 m

-8.4 m

- Shore cranes 5MT, 10MT, 16MT, 32MT.

- Floating cranes 10~80MT

- Forklifts

- Automatic bagging line

- Electronic scale 80~120MT

General cargo, container, bag, bulk vessels

M2

125 m

-8.4 m

M3

163 m

-8.4 m

M4

165 m

-8.4 m

M5

165 m

-8.4 m

M6

165 m

-8.4 m

M7

163 m

-8.4 m

M8

163 m

-8.4 m

M9

163 m

-8.4 m

M10

158 m

-8.4 m

M11

158 m

-8.4 m

 

Chua Ve Terminal

C1

132 m

-8.4 m

- Shore crane 40MT

- Gantry crane 32MT

- Dedicated forklifts 2~42MT

- Elect. scale 80MT

Container, general cargo vessels

C2

132 m

-8.4 m

C3

150 m

-8.4 m

C4

150 m

-8.4 m

C5

150 m

-8.4 m

 

Dinh Vu port area – Tan Cảng Hai Phong

ĐV3

230 m

-10.5 m

- Jib/Slewing crane 40MT

- Quayside gantry crane

Container, general cargo vessels 20,000DWT/1,200TEUs

ĐV4

230 m

-10.5 m

ĐV5

230 m

-10.5 m

ĐV6

230 m

-10.5 m

ĐV7

215 m

-10.5 m


. Storage facilities:


Warehouse/shed: 51,202 m2 of which CFS: 6,620m2.
Open storage: 598,000 m2, of which CY: 404,400m2.
Storage capacity: 220.000 tấn (MT), of which CY: 21.000 TEU


. Major equipment:



Type

No.

Capacity

Floating crane 1
80 MT
Quayside gantry crane 8
35.6~40 MT
Rubber-tyred gantry crane - RTG 12
35.6 MT
Jib/Slewing crane
38
5~40 MT
Forklift/Toplift/Reach stacker
66
3~45 MT
Rubber-tyred crane
6
25~50 MT
Computerized scale bridge
4
80~120 MT
Tug boat
9
510 HP~3200 HP
Mobile crane 10 25-50 MT
5. Cargo throughput:
2004 2005 2006 2008 2009 2010 2011
Total 10,500,000
MT
10,511,000
MT
11,151,000 MT
13,900,000 MT 14,370,000 MT 15,688,689 MT 17,891,568 MT
Import 5,370,000
MT
5,370,000
MT
5,199,000 MT 7,635,000 MT 8,226,000 MT 7,815,129 MT 7,861,456 MT
Export 1,800,000
MT
1,911,000
MT
2,825,000 MT 3,231,001 MT 2,376,000 MT 2,858,577 MT 3,989,431 MT
Domestic 3,300,000
MT
3,230,000
MT
3,127,000 MT 3,103,000 MT 3,768,000 MT 5,014,983 MT 6,040,681 MT
Container 398,300
TEUs
424,128
TEUs
464,000 TEUs 808,000 TEUs 816,000 TEUs 953,646 TEUs 1,018,794 TEUs
Ship calls 2,430 2,430 2,056 4,779 4,779 5,298 2,470


6. Development Plans

Project

Total cost of investment

Implementation

Project of Dinh Vu Port – Phase II

 

VND 1,500 billion

2005-2012.


The project of 4 berths completed with 4 wharves No.3, 4, 5, and 6, service infrastructure is being under construction).

Project of Dinh Vu Port – Phase III

 

VND 300 billion

2011-2012.

Including 1 berth to be started 01 Jan. 2011.

Purchase of handling equipment

VND 245.9 billion

2012

 

7. Main services:

Cargo handling, baging/packing, tallying and warehousing.
Tug assistance and maritime salvages to ocean vessels.
Cargo transit and container transshipment services.
Transport agent and forwarding.
Logistics services of container transport by Hai Phong-Lao Cai rail-way route.
On-land and by-waterway transport.
Ship agent and maritime brokerage.

 

8. Computer system:

11 servers, 400 work-stations. Cisco network equipments all are assembled throughout the port area by cable network wireless 54 Mbps, STP cables, UTP cables, bronze cables. Current softwares: Container Terminal Management System – CTMS, Management Information Systems – MIS, camera system, security gate management and control system, internal document management system

 

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email