North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
 
 
 
  1. Port’s name & contact address:
 

SP – PSA INTERNATIONAL PORT

Port's name: SP – PSA INTERNATIONAL PORT
Under: Joint Venture
Port's location: 10o 34’00.24”N - 107o01’08.35”E
Pilot boarding position: 10o19’00”N – 107o02’00”E
Address: Road # 3, Phu My I Industrial Zone, Phu My Town, Tan Thanh District, Ba Ria – Vung Tau province, Vietnam
Tel: +84 (064) 3 924 567                        
Fax: +84 (064) 3 924 555
Email: info@sp-psa.com.vn  
Website: www.sp-psa.com.vn


  2. Management:
 
General Director

Mr. Michael Anthony Formoso        
Tel: +84.64 392 4568

Deputy G. Director Mr. Hồ Lương Quân                          
Tel: +84.64 392 4570
Vice Director for Engineering Mr. Paul Liew                     
Tel: +84.64 392 4591
Vice Director for Operations Mr. Png Yita Silas             
Tel: +84.64 392 4581
  3. Access channel:
   

Length: 30 km. Depth: -12.0m. Tidal regime: Irregular semi-diurnal. Average variation: 2.72 m.
Maximum draft: 13.5 m. Maximum size of vessel acceptable: ≥ 80,000 DWT.

  6. Infrastructure and equipment:
 

- Berth facilities:

Name/No.

Length

Depth alongside

Vessel/Cargo

 

Berth No.1

 

300 m

 

-14.5 m

 

Container

 

Berth No.2

300 m

-14.5 m

Container

 

- Storage facilities: Total  area: 270.000 m2

 

- Major equipment:

Type No Capacity

Quayside gantry crane                                     

4 60 MT
Ruber tyred Gantry Crane 12 40.6 MT
Prime mover 20

 

Sidelifter/Reachstacker 4

5-42 MT

Reefer Point 384  
  7. Cargo throughput in:
 
2009 2010 2011
Total 1.056.000 MT 3,526,944 MT

3,079,524 MT.

Import 1.056.000 MT 1,764,000 MT 1,512,000 MT
Export 0 1,762,944 MT 1,567,524 MT
Domestic 0 0 0
Container 96.000 TEUs 293,912 TEUs  
Shipp calls 68 134 117
  8. Development plan :
   

Project

Total investment

Implementation

2nd stage of 27 ha, extended to downstream

 

 

in plan

 

  9. Main services:
   

Container Handling/ Stored
Container services and custom clearance
Tug assistance

  10. Computer system:
   
CATOS operating System

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email