Port’s name: SAIGON PORT CO. LTD
Under: Vietnam National Shipping Lines
Port’s location: 10°50’N -106°45’E,
Pilot boarding position:
– Terminals in HCMC:
10°34’41”N – 107°01’27”E (Terminals in Phu My, Ba Ria-Vung Tau province).
Pilot boarding position: 10°20’N -107°03’E to the terminals in HCMC, 10°19’00”N -107°02’00” to the terminals in Phu My, Ba Ria-VT.
Head office: 3 Nguyễn Tất Thành str, Dist. 4, HCMC
Tel: (84.8) 39401825 – 39401826 – 39400826.
IDD call: (84.8) 9401030 – 38254362
Fax: (84.8) 39400168 – 38263092
E-mail: info@saigonport.com.vn
Website: www.saigonport.vn
General Director | Mr. VO HOANG GIANG Tel: (84.8) 39400412 |
Deputy General Director | Mr. NGUYEN QUOC HUNG Tel: (84.8) 39402975 |
Deputy General Director | Mr. NGUYEN UYEN MINH Tel: (84.8) 38265215 |
Deputy General Director | Mr. TRAN NGOC THACH |
Access channel to terminals in HCMC: length 85 km. Depth: 8.5 m. Draft: 10.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 2.7 m.
Maximum size of vessel accepted: 32,000 DWT alongside and 60,000 DWT at lighterage area, Thieng Lieng buoy berths
Access channel to terminals in Phu My, Ba Ria-Vung Tau pro.: Length 25 km. Depth: 9.1 m Minimum. Draft: 12.5m. Tidal regime: irregular semi-diurnal. Tidal range: 0.2~4 m.
M maximum size of vessel accepted: 50.000 DWT.
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
. in HCMC:
Nha Rong – Khanh HoiTerminal (15 wharves) Tan Thuan Terminal (4 wharves) Tan Thuan II Terminal (1 wharf) . in Phu My, Ba Ria-Vung Tau province: Phu My Steel Port |
1750m
773 m 222 m
230 m |
8.2 ~ 10 m
11.0 m
-14 m |
General/Pasenger
General/Container Roro/Cont./Bulk Bag/Bulk cargo Steels |
Total port area: 500,000 m2
Warehouse/shed: 25 (59,954 m2).
Open storage: 225,839 m2
Type | No. | Capacity |
Floating crane | 1 | 100 MT |
Quayside gantry crane | 2 | 40 MT |
RTGs | 3 | 1 over 4, 6 wide – 40 MT |
RMGs | 2 | 1 over 3, 12 wide – 40 MT |
Harbour mobile crane | 7 | 80 ~ 100 MT |
Rubber-tyred crane | 19 | 10 ~ 30 MT |
Crawler crane | 3 | 25 ~ 90 MT |
Rail mounted crane | 10 | 5 ~ 15 MT |
Reach stacker | 14 | 42 MT |
Forklift/toplift | 41 | 1.5 ~ 30 MT |
Bulldozer/Trimmer | 31 | |
Tractor with trailer/chassis | 31 | for 20’/40′ containers |
Tug boat | 18 | 425 HP & 2400 HP |
Bagging equipment | 21 | lines (alongside + in sheds) |
Truck | 20 |
Project | Cost of investment | Time planning & execution status |
Project of SP-PSA International Port, Phase I1 | Under planning | |
Project of Saigon-Hiep Phuoc Port, Phase I1 | Under planning |
Cargo handling, bagging, warehousing, tallying. On-land and by-waterway transports. Marine construction. Mechanics repairs. Tug assistances and marine salvage. Shipping agency. Ship chandler. Cargo import/export services. Forwarding and customs clearance formalities, ect.