1. Port's
name & contact address: |
| |
CAN THO SHIP INDUSTRY AND TRANSPORT JOINT STOCK COMPANY PORT
Ports name: Ship Industry and Transport Joint Stock Company Port
Under: Ship Industry and Transport Joint Stock Company and Can Tho Port Authority
Port's location: 10°04’N - 105°44'E
Pilot boarding position: 09°30'23”6N - 106°30'01”E
Address: 26Le Hong Phong, Binh Thuy Ward, Binh Thuy Dist, Can Tho City
Tel: (84.0710) 3846650 / 3885381
Fax: (84.0710) 3885380
E-mail: cangcashin@gmail.com
Website: www.cashin.vn
|

Mr. Mac Van Cuong |
|
|
|
|
|
2.Management: |
|
|
Director |
Mr. Mac van Cuong
Tel: 0918.025.439 |
| Deputy general Directorof operation |
Mr. Tran Minh Son
Tel: 0913.902.045 |
Deputy general Directorof operation |
Mr. Nguyen Thanh Tung
Tel: 0989.577.303 |
Deputy general Directorof operation
|
Mr. Phạm Duy Linh
Tel: 0918.512.939 |
Staff in charge of operation
|
Mr. Nguyễn Thanh Tòng
Tel: 0909.285.885 |
|
|
|
|
|
3. Access channel:
|
|
|
Length 61 knot. Channel depth: 4.2m. Tidal regime: semi-diurnal. Average tidal range: 3,0 -4.0m. Maximun Draft: - 7,0m.
Maximum size of vessel accepted: 5,000 DWT |
|
|
|
|
4. Berth facilities: |
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
Berth 01 |
90m |
7.0m |
5.000 DWT vessels
|
Bouy 01 |
190m |
9.6m |
6.500 DWT Vessels |
|
|
|
|
|
5. Storage facilities: |
|
|
Total area: 30.000 m2
Warehouse/shed: 1.280 m2. in which CSF station: 1.280 m 2
Total storage capacity: 120.000 MT.
|
|
|
|
|
6. Major equipment: |
|
| Type |
No. |
Capacity |
| Crawler Crane |
1 |
20 MT |
| Boiler Crane |
2 |
30 MT |
| Lift truck |
2 |
3-6 T |
| Trucks |
2 |
6.5 T |
|
|
|
|
|
7. Cargo throughput: |
|
|
2009 |
2010 |
| Total |
72,000 |
74,000 MT |
| Import |
0 |
0 |
| Export |
|
0 |
| Domestic |
72,000 |
74,000 MT |
| Ship calls |
130 176 |
134 |
Main Domestic: cement and rice: 180,000 MT |
|
|
|
|
8. Kế hoạch phát
triển: |
|
|
Dự án (Project) |
Tổng kinh phí đầu tư
(Total cost of investment) |
Kế hoạch thực hiện (Implenmentation) |
Bến phao 10.000 DWT (Construction of buoy berth for 10,000 MT vessel) |
3 tỷ Đồng (VND3 billion) |
2010-2011 |
2 kho 6000m2 (Construction of 6,000m2 two warehouses) |
10 tỷ Đồng (VND10 billion) |
2010-2012 |
Bãi Công-ten-nơ 5000m2 (Construction of 5,200m2 CY) |
5 tỷ Đồng (VND5 billion) |
2010-2012 |
|
|
|
|
|
9. Main services:
|
|
|
- Stevedoring, delivery, warehousing
- Cargo transportation by waterway
- Newly build and repair all waterway transportation means
|
|
|
|
|
10. Hệ thống máy
tính: |
|
|
06 PCsused for port operation activities
|
|
|
|
| |
|
|
|
|
|
|