North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

 
 
 
  1. Port's name & contact address:
 

CAI MEP INTERNATIONAL TERMINAL (CMIT)

  • Port’s name: Cai Mep International Terminal
  • Abbri: CMIT
  • Port’s location:
    10°31'01.966"N -107°00'51.132"E
    10°30'44.6849"N- 107°00'41.9484"E
  • Pilot boarding position: 10°19'40"N - 107°02'00"E
  • Address: Tan Loc Hamlet, Phuoc Hoa Commune, Tan Thanh District, Ba Ria – Vung Tau Province, Vietnam .
  • Tel: +84 (0) 64 3938 222 
  • Fax: +84 (0) 64 3938 200
  • Website: www.cmit.com.vn
2. Management:
General Director
Mr. Michael Them Rasmussen
Deputy G. Director
Mr. Nguyen Xuan Ky
3. Access channel:
  • Total length: 50 nautical miles
  • Depth along side:  14.5m
  • Tidal regime: irregular semi-diurnal
  • Average variation: 3.85m.
  • Maximum size of vessel accepted: 160.000  DWT

 

4. Berth facilities:

 

Name/No.

Length

Depth alongside

Vessel/Cargo

Phase 1

 400m

 14.5m+

Container

5. Storage facilities:
Total Area: 24 ha
6. Major equipment:

EQUIPMENT 

(Until 15 Apr, 2011)

Quantity and Specification

SUPER POST PANAMAX WITH TWIN LIFT

4 units

Outreach

63.5 meters

Lift height above wharf

42 meters

Total lift height

59 meters

Lifting capacity under spreader (twin lift)

65 tonnes

Lifting capacity under hook

100 tonnes

Hoisting/lowering  loaded

180 meters/minute

Hoisting/lowering  spreader only

90 metrs/minute

Trolley traversing

240 meters/minute

Gantry traveling

45 metres/minute

Boom hoisting

5 minutes

 

 

RUBBER TIRES GANTRY CRANES

13 units

Stacking

1 over 5 high (9' 6" high containers)

Automatic steering and slot identification

YES

Lifting capacity (single lift)

41 tonnes

 

 

LOADED REACHSTACKER

2 units

Stacking

5 high (9'6" high containers)

Lifting capacity

45 tonnes

 

 

EMPTY HANDLER

2 units

Stacking

7 high ( 9' 6" high containers)

 

 

TERMINAL TRACTORS

 

With hydraulic 5th wheel

5 units

With fixed 5th wheel

18 units

 

 

Bombcarts type chassis

25 units

Low bed type chassis

5 units

7. Cargo throughput in 2010: Nil

Date of Beginning for operation : 30 March, 2011

8. Development plan:

Project

Total investment cost

Implementation

 

Stage 2- 200m remaining wharf

 

Stage 2 - 200m remaining wharf

 

 

4, 2011

9. Main services:
Vessel Stevedoring

 

10. Computer systems:


  • Software for Port operation: SPARCSN4
  • Software: IFS

 

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email