VICT Port
Interflour Cai Mep
Tan Cang - Cai Mep International Terminal (TCIT)
CAI MEP INTERNATIONAL TERMINAL (CMIT)
Name/No.
Length
Depth alongside
Vessel/Cargo
Phase 1
400m
14.5m+
Container
EQUIPMENT
(Until 15 Apr, 2011)
Quantity and Specification
SUPER POST PANAMAX WITH TWIN LIFT
4 units
Outreach
63.5 meters
Lift height above wharf
42 meters
Total lift height
59 meters
Lifting capacity under spreader (twin lift)
65 tonnes
Lifting capacity under hook
100 tonnes
Hoisting/lowering loaded
180 meters/minute
Hoisting/lowering spreader only
90 metrs/minute
Trolley traversing
240 meters/minute
Gantry traveling
45 metres/minute
Boom hoisting
5 minutes
RUBBER TIRES GANTRY CRANES
13 units
Stacking
1 over 5 high (9' 6" high containers)
Automatic steering and slot identification
YES
Lifting capacity (single lift)
41 tonnes
LOADED REACHSTACKER
2 units
5 high (9'6" high containers)
Lifting capacity
45 tonnes
EMPTY HANDLER
7 high ( 9' 6" high containers)
TERMINAL TRACTORS
With hydraulic 5th wheel
5 units
With fixed 5th wheel
18 units
Bombcarts type chassis
25 units
Low bed type chassis
Date of Beginning for operation : 30 March, 2011
Project
Total investment cost
Implementation
Stage 2- 200m remaining wharf
4, 2011
| Home | Members | Organization Profile | Information Service | Standard | Regulations | Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email