1. Port’s name & contact address: |
| |
SP – PSA INTERNATIONAL PORT
Port's
name: SP – PSA INTERNATIONAL PORT
Under: Joint Venture
Port's location: 10o 34’00.24”N - 107o01’08.35”E
Pilot boarding position: 10o19’00”N – 107o02’00”E
Address: Road # 3, Phu My I Industrial Zone, Phu My Town, Tan Thanh District, Ba Ria – Vung Tau province, Vietnam
Tel: +84 (064) 3 924 567
Fax: +84 (064) 3 924 555
Email: info@sp-psa.com.vn
Website: www.sp-psa.com.vn |
|
|
|
|
|
| |
2. Management: |
| |
| General Director |
Mr. Michael Anthony Formoso
Tel: +84.64 392 4568 |
| Deputy G. Director |
Mr. Hồ Lương Quân
Tel: +84.64 392 4570 |
| Manager of Facility Dept |
Mr. Trương Văn Mạc Bút
Tel: (84.64) 3924587 |
| Vice Director for Engineering |
Mr. Paul Liew
Tel: +84.64 392 4591 |
| Vice Director for Operations |
Mr. Png Yita Silao
Tel: +84.64 392 4581 |
|
|
|
|
| |
3. Access channel: |
| |
|
Total length : 30 km
Depth along side : -14.5 (CD)
Tidal regime: Irregular semi-diurnal. Averagevariation: 2,72m. Maximum size of vessel accepted: 80.000 DWT and > 80.000DWT partial load
Highest draft : 12.0 m
|
|
|
|
|
|
|
| |
6. Infrastructure and equipment: |
| |
- Berth facilities:
Name/No. |
Length |
Depth alongside |
Level |
Vessel/Cargo |
Berth No.1 |
300m
|
- 14,5m
|
|
- Container
|
| Berth No.1 |
300m |
- 14,5m |
|
- Container |
- Storage facilities: Total area: 270.000 m2 - Warehouse/shed: |
| |
- Major equipment:
| Type |
No |
Capacity |
Quayside gantry crane |
4 |
60 MT under spreader/18tons |
| Ruber tyred Gantry Crane |
12 |
4.6 MT under spreader |
| PM |
20 |
với container 20’/40’có giá nâng |
| Sidelift/Reachstacker |
3 |
42 MT |
| Reefer Point |
384 |
|
|
|
|
|
| |
7. Cargo throughput in: |
| |
|
2009 |
2010 |
| Total |
1.056.000 MT |
3,526,944 MT |
| Import |
1.056.000 MT |
1,764,000 MT |
| Export |
0 |
1,762,944 MT |
| Domestic |
0 |
0 |
| Container |
96.000 TEUs |
293,912 TEUs |
| Shipp calls |
68 |
134 |
|
|
|
|
| |
8. Development plan : |
| |
|
Project |
Total investment |
Implementation |
2nd stage of 27 ha, extended to downstream |
|
in plan |
|
| |
9. Main services: |
| |
|
Container Handling/ Stored
Container services and custom clearance
Tug assistance
|
|
|
|
| |
10. Computer system: |
| |
|
CATOS operating System |
|
|
|
|
|
|
|