NGHE TINH PORT |
| 1.
Port's name & contact address: |
Port's name: NGHE TINH PORT
Under: Vietnam Maritime Administration
Port's location: Cua Lo Terminal 18°49'42"N - 105°40'E
Ben Thuy Terminal 18°39'N - 105°42'E
Pilot boarding position: 18°48'5"N - 105°48'2"E
Address: 10 Truong Thi street, Vinh city, Nghe An province
Tels. No.: (84.38) 3847143 / 3847145
Fax No.: (84.38) 3847142
E-mail: ndh@nghetinhport.com.vn
Website: www.nghetinhport.com.v
|

Mr. Le Dinh Nham
|
| 2. Management |
Director |
Mr. Le Dinh Nham
Tel: (84.38) 3847145 |
Vice
Director, Engineering |
Mr. Nguyen Hai Hoa
Tel: (84.38) 3590605 |
Vice
Director, Operations |
Mr. Le Trong Thin
Tel: (84.38) 3847144 |
| Vice
Director |
Mr. Le Doan Long
Tel: (84.38) 3951766 |
|
3.
Access channel:
- To Cua Lo terminal: 4 km, channel depth: 5.5 m, Tidal regime: semi-diurnal. Average tidal range: 2 m. Maximum draft: -7.5 m. Maximum size of vessel accepted: 10,000 DWT.
- To Ben Thuy terminal: 27 Km, channel depth: 2.5 m. Tidal regime: semi-diurnal. Average tidal range: 2 m. Maximum draft: -4.5 m. Maximum size of vessel accepted: 1,500 DWT.
|
| 4. Infrastructure
and equipment: |
.
Berth facilities:
|
Name/No. |
Length |
Depth
alongside |
Vessel/Cargo |
|
| No.1
(Cua Lo Terminal) |
160
m |
-7.5
m |
5,000~10,000
MT |
| No.2
(Cua Lo Terminal) |
160
m |
-7.5
m |
5,000~10,000
MT |
| No.3
(Cua Lo Terminal) |
168
m |
-7.5
m |
10,000~15,000
MT |
| No.4
(Cua Lo Terminal) |
168
m |
-7.5
m |
10,000~15,000
MT |
| No.1
(Ben Thuy Terminal) |
30
m |
-4.5
m |
1,000~2,000
MT |
| No.2
(Ben Thuy Terminal) |
30
m |
-4.5
m |
1,000~2,000
MT |
| No.3
(Ben Thuy Terminal) |
30
m |
-3.5
m |
1,000~1,500
MT |
| No.6
(Ben Thuy Terminal) |
60
m |
-3.5
m |
1,000~1,500
MT |
|
. Storage facilities:
Total area: 227,800 m2, of which:
Warehouse/shed: 19,000 m2, of which CFS: 3,000 m2.
Open storage: 180,500 m2, of which yard for stacking containers: 17,930 m2. Tank: 6,500 m3
Total storage capacity: 800,000 MT
. Major equipment: |
| Type |
No. |
Capacity |
| Heavy cargo crane |
01 |
130 T |
| Forklift, |
03 |
25~32T lifting |
| Tractor |
06 |
6MT |
| Truck |
06 |
5~7 MT |
| Tugboat |
03 |
490 -850CV |
| Excavator |
06 |
0,8 -2,3m3 |
| Cargo vessel |
01 |
920 MT |
| Grab |
11 |
0,9 – 4,5m3 |
| Jib crane |
01 |
40 MT |
| Crane |
01 |
10 – 36MT |
|
| 5. Cargo throughput: |
|
2002 |
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
| Total |
868,909 MT |
872,346 MT |
960,753 MT |
1,250,000 MT |
1,270,000 MT |
1,380,000 MT |
1,331,606 MT |
| Import |
126,978 MT |
105,412 MT |
74,764 MT |
50,000 MT |
39,000 MT |
50,000 MT |
43,202MT |
| Export |
74,148 MT |
145,837 MT |
181,683 MT |
380,000 MT |
402,000 MT |
450,000 MT |
522,129 MT |
| Domestic |
667,783 MT |
621,097 MT |
704,306 MT |
820,000 MT |
829,000 MT |
880,000 MT |
766,275 MT |
| Ship calls |
937 |
1,036 |
941 |
859 |
850 |
907 |
893 |
|
|
| 6. Development
Plans |
|
Project |
Total cost of investment |
Implementation |
Upgrading and expansion of Cua Lo terminal- phase 2 |
VND 680 billion |
2010-2015 |
Construction of Hung Hoa Terminal |
VND 30 billion |
2008-2013 |
|
|
|
|
7. Main services
Handling, warehousing, and transporting of cargoes. Transport agent. Mechanics repairs. Construction works, etc.
|
8. Computer system
30 PCs, appl0ied in finance, wages, and statistics management.
|
|