North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

 
 
 

KY HA - QUANG NAM PORT
1. Port's name & contact address:


Port's name: KY HA - QUANG NAM PORT
Under: Chu LaiOpen Economic Zones
Port's location: 15°28'44"N - 108°41'03.5E
Pilot boarding position: 15°29'5"N - 108°41'7"E
Address: Tam Quang commune, Nui Thanh district, Quang Nam province
Tel.: (84.510) 3550777 - 3550108       
Fax: (84.510) 550108 / 872787                  
E-mail: kyhaport@dng.vnn.vn


2. Management:

Vice Director, Engineering
Mr. Vo Phuoc Long
Tel: (84.510) 550575
3. Access channel:
- Length: 3 km.
- Channel depth: -5.2 m.
- Tidal regime: semi-diurnal.
- Average tidal range: 1.2 m.
- Maximum draft: 6.0 m
- Maximum size of vessel accepted: 6,000 DWT.
4. Infrastructure and equipment:
. Berth facilities:

Name/No.

Length

Depth alongside
Vessel/Cargo
 
Wharf No.2
160 m
-8.2 m
General cargo/Container
. Storage facilities:

Total port area: 54,000 m2, of which:
Warehouse/shed: 3,000 m2. Open storage: 30,000 m2,

. Major equipment:

Type

No.

Capacity

Shore crane 6
20 ~ 80 MT
Forklift 3
3 MT
Tractor 5
30 MT
Tug boat 1
530 HP
Scale bridge 1
60 MT
Grab 4
2.5 m3
Excavator 3  
5. Cargo throughput
2003 2004 2005 2006 2007 2008 2009 2010
Total 54,000 MT 70,000 MT 105,000 MT 300,000 MT 530,000 MT 400,000 MT 40,000 MT 594,000 MT
Import 15,000 MT 7,000 MT 10,000 MT 5,200 MT 10,000 MT 100,000 MT   55,000 MT
Export 5,000 MT 13,000 MT 80,000 MT 210,000 MT 350,000 MT 177,000 MT   163,000 MT
Domestic 30,000 MT 50,000 MT 15,000 MT 84,800 MT 170,000 MT 123,000 MT 40,000 MT 376,000 MT
Container       3,500 TEUs 5,000 TEUs 6,115 TEUs 10,000 TEUs 24,774 TEUs
Ship calls 54 94 100 230 317 220 200 256
6. Development Plans


Dự án/kế hoạch (Project/Planning)

Tổng kinh phí (Total cost of investment)

Thời gian thực hiện (Implementation)

Nâng cấp cầu cảng (Upgrading of  wharf)

 

400 tỷ Đồng (VND 400 bilion)

2011

Nạo vét luồng cho tàu 20,000DWT (dredging channel to receiver vessel of 20,000DWT)

850 tỷ Đồng (VND 850 billion)

2011

7. Main services:

  • Cargo handling.
  • Warehouse leasing
  • Tug boat service
  • Freshwater supply

8. Computer system:

11 PCs with softwares applied in port management and operations

 

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email