CAM RANH PORT |
| 1.
Port's name & contact address: |
Port's name: Cam Ranh Port Limited Liability Compay
Under: Khanh Hoa Province's Department of Transport
and Communications
Port's location: 11°54'N - 109°09'E
Pilot boarding position: 11°48'5"N - 109°12'5"E
Address: 29 Nguyen Trong Ky Str., cam Linh ward, Cam Ranh
town, Khanh Hoa province
Tels. No.: (84.58) 3854307 / 3854565
Fax No.: (84.58) 3854536
email: mail@camranhport.vn
Website: www.camranhport.com.vn
|

Ông PHAM HUU TAN |
| 2. Management |
|
Director |
Mr. Pham Huu Tan
Tel: 84.58.3854703 |
Vice Director, Operations |
Mr. Duong Van Thanh
Tel: 84.58.3950252 |
Vice
Director, Administration |
Mr.
Pham Viet Nham
Tel: 84.58.3854930 |
|
3.
Access channel:
length: 8.6 nautical miles. Channel depth: -10.2 m. Tidal regime: semi-diurnal.
Average tidal range: 1.5 m. Maximum draft: 9.7 m
Maximum size of vessel accepted: 30,000 DWT
|
| 4. Infrastructure
and equipment: |
.
Berth facilities:
|
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
| Main wharf |
182 m |
-11 m |
General cargoes |
| Auxiliary wharf |
126,5 m |
- 6 m |
General cargoes |
|
. Storage facilities:
Total port area:890,000 m2, of which: Warehouse/shed: 11,000 m2. Open storage: 30,000 m2.
Total storage capacity: 90,000 MT
. Major equipment: |
|
Type |
No. |
Capacity |
|
Shore crane |
8 |
15 ~ 35 MT |
| Tug
boat |
2 |
960HP, 1500HP |
| Forklift/Bulldozer/trimmer/truck |
50 |
|
| Grap |
4 |
|
| Electronic scale bridge |
1 |
80MT |
|
| 5. Cargo throughput: |
|
2003 |
2004 |
2005 |
2006 |
2007 |
2008 |
2009 |
2010 |
| Total |
672,000 MT |
1,104,500
MT |
923,000 MT |
942,373 MT |
1,140,776 MT |
1,295,798 MT |
1,256,913 MT |
1,486,639 MT |
| Import |
6,000 MT |
4,700
MT |
Nil |
Nil |
Nil |
12,360 |
63,080 MT |
4,188 MT |
| Export |
336,000 MT |
742,500
MT |
600,000 MT |
516,597 MT |
697,745 MT |
854,176 MT |
622,424 MT |
946,838 MT |
| Domestic |
330,000 MT |
357,300
MT |
323,000 MT |
425,776 MT |
443,031 MT |
429,262 MT |
571,409 MT |
535,613 MT |
| Ship calls |
272 |
338 |
329 |
401 |
397 |
503 |
518 |
483 |
|
|
| 6. Development
Plans |
Dự án (Project) |
Tổng kinh phí (Total cost of investment) |
Kế hoạch thực hiện (Implementation) |
Dự án đầu tư xây dựng Bến số 2 - Cảng Cam ranh - Giai đoạn 1. Gói thầu số 8 gồm thi công nạo vét khu vực trước bến đạt độ sâu 12,6m, xây dựng cầu chính 50.000 DWT dài 180m rộng 30m, trụ neo tàu, phao neo (Project of Cam Ranh port - phase I: construction of wharf No.2. Items of Package No.8: dredging at water front area to reach the depth of 12.6m, construction of the main wharf - 180m length and 30m width - for 50,000DWT vessel, bollards and buoys for vessel achorage): |
210 tỷ Đồng (VND 210 billion) |
Dự kiến kết thúc vào cuối năm 2011 (Expected to be completed at the end of 2011) |
|
7. Main services:
- Cargo handling, tallying, packing
- Warehouse/yard services and cargo storages
- Transport services in short distances
- Shipping agency
- Tug assistances to ocean vessels
- Supply of fuel oil
- Other maritime services as requested by customers
|
8. Computer system:
10 PCs
|
|