North area
> Quang Ninh Port
> Cam Pha Port
> Hai Phong Port
> Cua Cam Port
> Dinh Vu Port
> Vat Cach Port
> Doan Xa Port
> B12 Oil Terminal Port
> Transvina
> PTSC Dinh Vu Port
Central area
> Thanh Hoa Port
> Nghe Tinh Port
> Viet - Lao Vung Ang
> Quang Binh Port
> Cua Viet Port
> Thuan An Port
> Chan May Port
> Da Nang Port
> Nguyen Van Troi Port
> Ky Ha Port
> Ky Ha-Quang Nam Port
> Hai Son Port
> Song Han 9 Port
> Qui Nhon Port
> Nha Trang Port
> Thi Nai Port
> Cam Ranh Port
> Vung Ro Port
South area
> Binh Minh Port
> Phu My Port
> Cai Cui Port
> Dong Nai Port
> Saigon New Port
> Saigon Port
> Ben Nghe Port
> Binh Duong Port
> Tan Thuan Dong Port
> Rau Qua Port
> Cat Lai Oil Port
> Saigon Petro Port
> Nha be Oil Port
> Bong Sen Port
> My Tho Port
> Dong Thap Port
> Vinh Long Port
> Can Tho Port
> Ben Dam-Con Dao VT
> Vung Tau Commercial Port
> Tra Noc - Can Tho
> An Giang Port
>

VICT Port

> Can Tho ship industry and transport
> SP-PSA
>

Interflour Cai Mep

> Cai Mep International Terminal
> Saigon premier container terminal (SPCT)
>

Tan Cang - Cai Mep International Terminal (TCIT)

> PVC-MS
> Cai Mep Oil Terminal
> PV Shipyard
 
 
 

QUI NHON PORT
1. Port's name & contact address:



Port's name: QUI NHON PORT LIMITED COMPANY
Under: Vietnam National Shipping Lines
Port's location: 13°44'33"N - 109°14'E
Pilot boarding position: 13°44'33"N - 109°15'00"E
Address: 2 Phan Chu Trinh street, Qui Nhon city, Binh Dinh province
Tels.: 84.56.3892159 / 3892363
Fax: 84.56.3891783
E-mail: quinhonport@dng.vnn.vn
Website: http://www.quinhonport.com.vn



Mr. Nguyen Huu Phuc
2. Management
General Director
Mr Nguyen Huu Phuc            
Tel: +84.56.3892345
Deputy general director

Mr. Le Minh Tien     
Tel: (84.56) 3894433

Deputy General Director
Mr. Huynh Tan Quy Nhơn  
Tel: +84.56.3892159
3. Access channel:
- Length 9 km.
- Channel depth: -11.0 m.
- Tidal regime: irregular semi-diurnal.
- Average tidal range: 2 m.
- Maximum draft: - 13.8 m.
- Maximum size of vessel acceptable: 30,000 DWT & 50.000 lighterage
4. Infrastructure and equipment:
. Berth facilities:

Name/No.

Length

Depth alongside

Vessel/Cargo

 
Wharf No.1
115 m
-7.5 m
25.000T / Bag, bulk, wood logs
Wharf No.2
115 m
-7.5 m
25.000T / Bag, comtainer
Wharf No.3
120 m
-7.5 m
25.000T / Bag, comtainer
Wharf No.4
155 m
-8.5 m
20,000T / Bag, bulk
Wharf No.5
155 m
-8.5 m
20,000T / Bag, bulk, container
Wharf No.6
175 m
-11.8 m
50.000T / Bag, bulk, container

1 buoy berth, depth: - 7m

. Storage facilities:

Total port area: 310,686 m2, of which:
Warehouse/shed: 20.120 m2, including 1,915 m2 of CFS.
Open storage: 205.000 m2, including 50,000 m2 for containers.
Tank: 12.000 m3.
Total storage capacity: 200.000 MT.

. Major equipment:


Type

Quantity

Capacity

Habour mobile crane

02

63 & 100 MT

100MT automobile crane

01

100 MT

Rubber-tyred crane

20

07-80 MT

MT container lifter 2 10 MT
Laden container lifter 3 45 MT
Forklift 10 1.7 – 7 MT
Tug boat 5 800HP & 980HP
Tractor with chassis/trailer 14  
Truck/Dump truck 90 14~16 MT
Buldozer/excavator 19  
Scale bridge 3 80 MT
5. Cargo throughput:
2006 2007 2008 2009 2010 2011 2012
Total 2,671,001
MT
3,208,879 MT 3,310,799 MT 3,855,679 MT 4,501,555 MT 5,492,997 MT 5,615,789 MT
Import 641,293 MT 828,148 MT 834,688 MT 835,611 MT 761,571 MT 744,261
MT
771,977 MT
Export 1,302,586 MT 1,603,210 MT 1,524,644 MT 2,016,017 MT 2,638,674 MT 3,331,268
MT
3,482,238 MT
Domestic 727,122 MT 777,521 MT 951,467 MT 1,004,051 MT 1,101,310 MT 1,417,468
MT
1,361,574 MT
Container 51,946 TEUs 61,826 TEUs 72,276 TEUs 54,649 TEUs 72,224 TEUs

62,549
TEUs

63,427 TEUs

Ship calls 1,091 1,264 1,296 1,510 1,599 1,660 1,659
6. Development Plans

Project

Total cost of investment

Implementation

Construction 200m wharf for 30,000Dwt container vessel and purchase of dedicated equipment  for handling containers


VND 750 billions


2010 - 2016

Purchase of handling equipment, and construction works

VND 84,35 billions

2012 - 2013

 

7. Main services:

  • Cargo handling, warehousing.
  • Tug boat service.
  • Cargo transportation by waterway.
  • Granite mining and processing.
  • Agency for transportation.
  • Supplying facilities for port operation.
  • Food service. Ship chandler.
  • Oil business.
  • Mechanical products processing. Repairing machine, equipment and means of transport on land and by waterway.
  • Wharf repairing.
  • Assembly of berth equipment.
  • Civil and industrial construction.

8. Computer system:

100 PCs applied in office management, and trading operations

 

 

| Home | Members | Organization Profile | Information Service | Standard | Regulations
| Jobs & Training | Refreshing Pictures | Maritime Terms | Forum | Email