Port’s name: DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port’s location:
– Long Binh Tan Terminal: 10°54’01″N – 106°50’29″E
– Go Dau A Terminal: 10°39’28″N – 107°01’16″E
– Go Dau B Terminal: 10°37’08″N – 107°01’26″E
Pilot boarding position: 10°20’N – 107°02’E
Main office: Long Binh Tan ward, Bien Hoa city, Dong Nai province
Tel: 84.61.3832225/3831439/3543328
Fax: 84.61.3831259
E-mail: dongnaiport@vnn.vn
Website: www.dongnai-port.com
Chairman | Mr. TRAN THANH HAI Tel: 0613.832.225 |
General Director | Mr. NGUYEN NGOC TUAN Tel: 0613. 832.225 |
Deputy G.D. for Engineering & Administration | Mr. DO VAN SAM Tel: 0613. 832.225 |
Deputy G.D. for Business | Mr. TRAN VAN NGUYEN Tel: 0613. 832.225 |
- To Long Binh Tan Terminal situated on the Dong Nai river: length 100 km. Channel depth: 4m. Tidal regime: irregular semi-diurnal. Average tidal range: 3.0 m. Maximum draft: 6.2m.Maximum size of vessel accepted: 5,000 DWT.
- To Go Dau A and Go Dau B Terminals situated on the Thi Vai river: length 35 km. Channel depth: 6.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 4.6 m. Maximum Draft: 11.1m.Maximum size of vessel accepted: at Go Dau A wharf: 10,000DWT vessel and Go Dau B: 15,000DWT vessel).
Name/No. |
Length |
Depth alongside |
Vessel/Cargo |
K1 Long Binh Tan
K2 Long Binh Tan K3 Long Binh Tan K4 Long Binh Tan A1 Go Dau A3 Go Dau Expanded A3 Go Dau B1 Go Dau B2 Go Dau B3 Go Dau |
60.2 m
72.0 m 67.8 m 14.0 m 30.0 m 110.0 m 110.0 m 58.0 m 120.0 m 105.0 m |
-3.3 m -3.6 m -7.5 m -3.0 m -6.4 m -9.5 m -9.5 m -5.0 m -10.3 m -10.0 m |
General cargo
ditto ditto General cargo ditto ditto ditto |
otal port area: 817,526 m2 (Long Binh Tan: 82,686 m2, Go Dau A: 167,383 m2, Go Dau B: 224,667 m2). Warehouse/shed: 5,000 m2. Open storage: 168,000 m2. Tank: 3.000 m3
Total storage capacity: 200,000 MT
Type | No. | Capacity |
Shore crane | 14 | 40~100 MT |
Laden container lifter | 2 | 45 MT |
Empty container lifter | 2 | 8~ 10 MT |
Tractor with chassis | 10 | 40 MT |
Lift tractor | 2 | 30 MT |
Project | Cost of investment | Implementation |
– Expanding Dong Nai Terminal, Phase I | VND 126.8 billion | Being in use and operations |
– Expanding Dong Nai Terminal, Phase II | VND 438.5 billion | Expected to be completed in the end of 2015 for infrastructure items |
– Expanding Go Dau B Terminal, Phase II | VND 318.2 billion | Expected to be put into operations in 2016 |
- Port facilities operations and management
- Handling & transportting cargoes in or outside the port area
- Repairs of handling equipment and transportation means
- Ship agent and maritime services
- Supplying fuel to vessels/vehicles: petrol, lubricant,…
- Taxi transporting sevices
- Trading construction materials: soil, stones, sand, gravel
- Duty free shop, seamen’s club
- Surveying, designing and constructing communication works
- Real estate
- Trading, and importing wood logs, steels, argriculture products except cotton and cashew.
- Trading and supplying other products/services being in compliance with law and regulations.