DONG NAI PORT

1. Name and Address

Mr. NGUYEN NGOC TUAN
Mr. NGUYEN NGOC TUAN

Port’s name: DONG NAI PORT JOINT-STOCK CO
Under: SONADEZI
Port’s location:
– Long Binh Tan Terminal: 10°54’01″N – 106°50’29″E
– Go Dau A Terminal: 10°39’28″N – 107°01’16″E
– Go Dau B Terminal: 10°37’08″N – 107°01’26″E
Pilot boarding position: 10°20’N – 107°02’E
Main office: Long Binh Tan ward, Bien Hoa city, Dong Nai province
Tel: 84.61.3832225/3831439/3543328
Fax: 84.61.3831259
E-mail: dongnaiport@vnn.vn
Website: www.dongnai-port.com

2. Management

Chairman Mr. TRAN THANH HAI
Tel: 0613.832.225
General Director Mr. NGUYEN NGOC TUAN
Tel: 0613. 832.225
Deputy G.D. for Engineering & Administration Mr. DO VAN SAM
Tel: 0613. 832.225
Deputy G.D. for Business Mr. TRAN VAN NGUYEN
Tel: 0613. 832.225

3. Access channel

  • To Long Binh Tan Terminal situated on the Dong Nai river: length 100 km. Channel depth: 4m. Tidal regime: irregular semi-diurnal. Average tidal range: 3.0 m. Maximum draft: 6.2m.Maximum size of vessel accepted: 5,000 DWT.
  • To Go Dau A and Go Dau B Terminals situated on the Thi Vai river: length 35 km. Channel depth: 6.5m. Tidal regime: irregular semi-diurnal. Average tidal range: 4.6 m. Maximum Draft: 11.1m.Maximum size of vessel accepted: at Go Dau A wharf: 10,000DWT vessel and Go Dau B: 15,000DWT vessel).

4. Berths

Name/No.

Length

Depth alongside

Vessel/Cargo

K1 Long Binh Tan

K2 Long Binh Tan

K3 Long Binh Tan

K4 Long Binh Tan

A1 Go Dau

A3 Go Dau

Expanded A3 Go Dau

B1 Go Dau

B2 Go Dau

B3 Go Dau

    60.2 m

72.0 m

67.8 m

14.0 m

30.0 m

110.0 m

110.0 m

58.0 m

120.0 m

105.0 m

-3.3 m

-3.6 m

-7.5 m

-3.0 m

-6.4 m

-9.5 m

     -9.5 m

-5.0 m

  -10.3 m

-10.0 m

General cargo

ditto
Container
ditto
ditto

ditto

General cargo

ditto

ditto

ditto

5. Storage

otal port area: 817,526 m2 (Long Binh Tan: 82,686 m2, Go Dau A: 167,383 m2, Go Dau B: 224,667 m2). Warehouse/shed: 5,000 m2. Open storage: 168,000 m2. Tank: 3.000 m3
Total storage capacity: 200,000 MT

6. Equipments

Type No. Capacity
Shore crane 14 40~100 MT
Laden container lifter 2 45 MT
Empty container lifter 2 8~ 10 MT
Tractor with chassis 10 40 MT
Lift tractor 2 30 MT

7. Cargo throughput

8. Development plan

Project Cost of investment Implementation
– Expanding Dong Nai Terminal, Phase I VND 126.8 billion Being in use and operations
– Expanding Dong Nai Terminal, Phase II VND 438.5 billion Expected to be completed  in the end of 2015 for infrastructure items
– Expanding Go Dau B Terminal, Phase II VND 318.2 billion Expected to be put into operations in 2016

9. Main services

  • Port facilities operations and management
  • Handling & transportting cargoes in or outside the port area
  • Repairs of handling equipment and transportation means
  • Ship agent and maritime services
  • Supplying fuel to vessels/vehicles: petrol, lubricant,…
  • Taxi transporting sevices
  • Trading construction materials: soil, stones, sand, gravel
  • Duty free shop, seamen’s club
  • Surveying, designing and constructing communication works
  • Real estate
  • Trading, and importing wood logs, steels, argriculture products except cotton and cashew.
  • Trading and supplying other products/services  being in compliance with law and regulations.